Pratondo W, Wahyu, Budi Witjaksana, and Hanie Teki Tjendani. 2024. “ANALYSIS OF CONTRACT CHANGE ORDER (CCO) COSTS IN BUILDING CONSTRUCTION PROJECTS”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM 3 (1):141-54. https://doi.org/10.55047/ijateis.v3i1.991.