Adam, Ijaz, Budi Witjaksana, and Hanie Teki TJendani. 2024. “TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM 3 (1):57-73. https://doi.org/10.55047/ijateis.v3i1.992.