Pramadha, I. Y., Tjendani, H. T. and Witjaksana, B. (2024) “COST AND TIME ANALYSIS USING EARNED VALUE METHOD ON THE CONSTRUCTION OF THE NATIONAL KEDIRI AIRPORT ACCESS ROAD PHASE 1 KEDIRI - NGANJUK”, INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM , 3(1), pp. 119–130. doi: 10.55047/ijateis.v3i1.1023.