Cahyono, B., Marleno, R. and Oetomo, W. (2024) “COST AND TIME ANALYSIS USING THE EARNED VALUE METHOD IN THE CONSTRUCTION PROJECT OF THE BPBD BUILDING COMPLEX IN PASURUAN DISTRICT”, INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM , 2(4), pp. 400–411. doi: 10.55047/ijateis.v2i4.1043.