Irniawan, D., Oetomo, W. . and Marleno, R. . (2024) “COST AND TIME ANALYSIS USING EARNED VALUE METHOD IN ADMINISTRATION BUILDING CONTRUCTION PROJECT AT POLIJE CAMPUS”, INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM , 2(4), pp. 423–432. doi: 10.55047/ijateis.v2i4.1059.