Hartawan, A. S., Witjaksana, B. . and Wulandari, E. . (2024) “TIME ANALYSIS WITH CRITICAL PATH METHOD: (Case Study on Jakarta Sewerage Development Project Zone 1, Package 2: Sewer Construction in Area 1-1)”, INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, 3(3), pp. 370–384. doi: 10.55047/ijateis.v3i3.1174.