Prasetiyo W., A., Oetomo, W. and Wulandari, E. (2023) “COMPARATIVE ANALYSIS OF ACCELERATION ALTERNATIVES FOR THE DRAINAGE CHANNEL PROJECT ON XYZ STREET USINGTHE TIME-COST TRADE-OFF (TCTO) METHOD”, INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM , 2(3), pp. 155–174. doi: 10.55047/ijateis.v2i3.882.