[1]
D. C. Putri, B. . Witjaksana, and H. T. . Tjendani, “TIME DELAY ANALYSIS USING CRITICAL PATH METHOD (CPM) (Case Study: Kerobokan Bali Parking Building Construction Project)”, Int. J. Adv. Technol. Eng. Inform. Syst., vol. 3, no. 4, pp. 502–517, Sep. 2024.