[1]
I. K. R. Sartiyana, L. D. Nugroho, and H. Muhammadun, “Time and Cost Control Analysis of the Construction of the Joyoboyo Zoo Intermodal Terminal Pedestrian Tunnel Using the Critical Path Method ”, Int. J. Adv. Technol. Eng. Inform. Syst., vol. 4, no. 1, pp. 18–25, Jan. 2025.