[1]
Y. P. Putranto, A. Patriadi, and S. Sajiyo, “Analysis of Project Time Using the Earned Value Method Concept on the Situbondo District Bagor Bridge Replacement Project”, Int. J. Adv. Technol. Eng. Inform. Syst., vol. 4, no. 1, pp. 48–63, Jan. 2025.