[1]
R. Rudiansyah, H. T. Tjendani, and E. Puspanantasari, “Time and Cost Analysis Using the Fast Track Method in the ITS Bank Building Construction Project”, Int. J. Adv. Technol. Eng. Inform. Syst., vol. 4, no. 3, pp. 373–382, Jul. 2025.