[1]
A. M. Alamsyah, B. Witjaksana, and J. Purnama, “Analysis of Construction Project Duration Acceleration Through Workforce Addition Using the Crashing Method at SD Negeri 2 Murtajih Building”, Int. J. Adv. Technol. Eng. Inform. Syst., vol. 4, no. 4, pp. 527–541, Feb. 2026.