[1]
G. R. Rakasyiwi, B. Witjaksana, and H. T. Tjendani, “PROJECT SCHEDULING ANALYSIS USING THE CRITICAL PATH METHOD – CASE STUDY: SUBSIDIZED HOUSE CONSTRUCTION PROJECT IN HILL MULYA HOUSING, SAMARINDA CITY”, IJATEIS, vol. 1, no. 4, pp. 73–88, Dec. 2022.