[1]
A. Prasetiyo W., W. Oetomo, and E. Wulandari, “COMPARATIVE ANALYSIS OF ACCELERATION ALTERNATIVES FOR THE DRAINAGE CHANNEL PROJECT ON XYZ STREET USINGTHE TIME-COST TRADE-OFF (TCTO) METHOD”, Int. J. Adv. Technol. Eng. Inform. Syst., vol. 2, no. 3, pp. 155–174, Oct. 2023.