[1]
S. Ariyanto, H. T. Tjendani, and B. Witjaksana, “TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD WITH ADDITIONAL WORKING HOURS IN THE CONSTRUCTION PROJECT OF KAPAS – GLENDENG 8 BRIDGE, BOJONEGORO DISTRICT”, Int. J. Adv. Technol. Eng. Inform. Syst., vol. 2, no. 4, pp. 273–293, Jan. 2024.