[1]
B. A. Nugraha, H. T. . Tjendani, and B. . Witjaksana, “COST AND TIME ANALYSIS USING THE CRASHING METHOD ON THE PROBOLINGGO – BANYUWANGI TOLL ROAD PROJECT PEKET 2: STA 9+000 – 20+200”, Int. J. Adv. Technol. Eng. Inform. Syst., vol. 2, no. 4, pp. 387–399, Jan. 2024.