Putra, H. R., K. Koespiadi, and W. Oetomo. “TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD (CASE STUDY: TANJUNG UNCANG JETTY CONSTRUCTION PROJECT BATAM CITY)”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, vol. 3, no. 1, Jan. 2024, pp. 82-91, doi:10.55047/ijateis.v3i1.1018.