Pramadha, I. Y., H. T. Tjendani, and B. Witjaksana. “COST AND TIME ANALYSIS USING EARNED VALUE METHOD ON THE CONSTRUCTION OF THE NATIONAL KEDIRI AIRPORT ACCESS ROAD PHASE 1 KEDIRI - NGANJUK”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, vol. 3, no. 1, Jan. 2024, pp. 119-30, doi:10.55047/ijateis.v3i1.1023.