Prasetiyo W., A., W. Oetomo, and E. Wulandari. “COMPARATIVE ANALYSIS OF ACCELERATION ALTERNATIVES FOR THE DRAINAGE CHANNEL PROJECT ON XYZ STREET USINGTHE TIME-COST TRADE-OFF (TCTO) METHOD”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, vol. 2, no. 3, Oct. 2023, pp. 155-74, doi:10.55047/ijateis.v2i3.882.