Nugraha, B. A., H. T. . Tjendani, and B. . Witjaksana. “COST AND TIME ANALYSIS USING THE CRASHING METHOD ON THE PROBOLINGGO – BANYUWANGI TOLL ROAD PROJECT PEKET 2: STA 9+000 – 20+200”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, vol. 2, no. 4, Jan. 2024, pp. 387-99, doi:10.55047/ijateis.v2i4.984.