Adam, I., B. Witjaksana, and H. T. TJendani. “TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, vol. 3, no. 1, Jan. 2024, pp. 57-73, doi:10.55047/ijateis.v3i1.992.