Purnomo, Didik, Wateno Oetomo, and Risma Marleno. “STUDY OF COST AND TIME ANALYSIS USING THE TIME COST TRADE-OFF (TCTO) METHOD IN THE CONSTRUCTION PROJECT OF THE OFFICE BUILDING OF A GOVERNMENT AGENCY (OPD) IN PASURUAN”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM 2, no. 4 (January 17, 2024): 376–386. Accessed July 2, 2024. https://ojs.transpublika.com/index.php/IJATEIS/article/view/1007.