Al- Qordhowi, Andrian Firdaus Yusuf, Muaffaq A. Jani, and Hary Moetriono. “INTEGRATED CONTROL PROJECT BASED ON COST AND TIME: (Implementation Case Study on Job Creation Construction of Videotron LED 6m X 12m in Size Baliwerti Project Surabaya)”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM 2, no. 1 (March 28, 2023): 52–73. Accessed March 14, 2026. https://ojs.transpublika.com/index.php/IJATEIS/article/view/695.