Prasetiyo W., Arif, Wateno Oetomo, and Esti Wulandari. “COMPARATIVE ANALYSIS OF ACCELERATION ALTERNATIVES FOR THE DRAINAGE CHANNEL PROJECT ON XYZ STREET USINGTHE TIME-COST TRADE-OFF (TCTO) METHOD”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM 2, no. 3 (October 28, 2023): 155–174. Accessed July 2, 2024. https://ojs.transpublika.com/index.php/IJATEIS/article/view/882.