1.
Alan Muin OE, Tjendani HT, Witjaksana B. COST AND TIME ANALYSIS OF THE FAST FOOD RESTAURANT BUILDING CONSTRUCTION PROJECT IN PONTIANAK USING CRASHING METHOD. Int. J. Adv. Technol. Eng. Inform. Syst. [Internet]. 2024 Jan. 20 [cited 2026 Apr. 24];3(1):191-203. Available from: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1046