1.
Putri DC, Witjaksana B, Tjendani HT. TIME DELAY ANALYSIS USING CRITICAL PATH METHOD (CPM) (Case Study: Kerobokan Bali Parking Building Construction Project). Int. J. Adv. Technol. Eng. Inform. Syst. [Internet]. 2024 Sep. 4 [cited 2026 Apr. 24];3(4):502-17. Available from: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1189