1.
Klau MJ, Sajiyo S, Tjendani HT. TIME ACCELERATION ANALYSIS USING THE TIME COST TRADE OFF METHOD ON THE WHEAT SILO AND PELLET SILO STRUCTURE REPAIR PROJECT PHASE III IN SURABAYA. Int. J. Adv. Technol. Eng. Inform. Syst. [Internet]. 2024 Jul. 8 [cited 2026 Feb. 21];3(3):385-9. Available from: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1254