[1]
Sartiyana, I.K.R., Nugroho, L.D. and Muhammadun, H. 2025. Time Control Analysis of the Construction of the Joyoboyo Intermodal Terminal Pedestrian Tunnel to the Surabaya Zoo. JOURNAL OF HUMANITIES, SOCIAL SCIENCES AND BUSINESS. 4, 2 (Jan. 2025), 304–312. DOI:https://doi.org/10.55047/jhssb.v4i2.1565.