[1]
Al-Putro, A.P., Nugroho, L.D. and Muhammadun, H. 2025. Analysis of Work Network and Critical Trajectory on Penganten - Ngampal Road Reconstruction Project Using Critical Path Method (CPM). TRANSPUBLIKA INTERNATIONAL RESEARCH IN EXACT SCIENCES. 4, 1 (Jan. 2025), 47–55. DOI:https://doi.org/10.55047/tires.v4i1.1599.