COMPARATIVE ANALYSIS OF COSTS AND TIMES OF RED BRICK AND LIGHT BRICK WORK ON THE MADRASAH MALLIMIN MUALLIMAT TAMBAK BERAS JOMBANG BUILDING PROJECT
Main Article Content
The problem in implementing the construction of the Madrasah Muallimin Muallimat Tambak Beras Jombang Building is that the available funds and time are limited. The approach regarding the material needed for this building work is light brick compared to other work items. In wall masonry work using light brick/hebel, it is necessary to analyze whether the work time can be faster and whether the price comparison obtained is cheaper. The research method used is Value Engineering analysis to produce cost savings. The results of this research include: a) Based on the results of cost and time analysis for wall items, namely by proposing alternative materials as replacements for the initial materials, resulting in cost savings of Rp. 28,298,995.61, and b) When compared with productivity, a builder is able to complete a red brick wall in 133 days, whereas with light brick wall material a builder is able to complete the work in 66 days. So, in terms of work speed, lightweight bricks are faster than red brick walls.
Abdullah. (2018). Sosiologi Pendidikan. PT Raja Grafindo Persada.
Ahmed, K. A. A., & Pandey, R. K. (2016). Concept of Value Engineering in Construction Industry. International Journal of Science and Research, 5(4).
Atabay, S., & Galipogullari, N. (2012). Application of Value Engineering in Construction Projects. Journal of Traffic and Transportation Engineering, 1(2).
Berawi, M. A., Priatno, H., Latief, Y., Sesmiwati, & Rahman, H. Z. (2011). Application of Value Engineering at Design Stage in Indonesia Construction Industry. University of Indonesia.
Day, S. P. (2012). Application of Value Engineering in the Construction of the Gambiran Hospital Building Phase II, Kediri City. JOS, 4(2).
Hidayat, A. N., & Ardianto, D. (2011). Value Engineering for the Development of Rusunawa Ambarawa.
Jumroh. (2018). Kondisi Belajar dan Teori Pembelajaran. Terjemahan Munansir.
Rusman. (2017). Model-Model Pembelajaran. PT. RajaGrafindo Persada.
Sesaria, D. (2013). Application of Value Engineering (Value Engineering) in the Building II Building Project, Faculty of Social and Political Sciences, Brawijaya University. Brawijaya University, Surabaya.
Witjaksana, B., Oetomo, W., & Toha, A. (2018). Cost and Time Analysis of the Graha Mojokerto Service City (Gmsc) Building Construction Project Due to Design Changes. Seminar Nasional Konsorsium Untag Se Indonesia, 1(1).