Vol. 3 No. 1 (2024): FEBRUARY

Published: 2023-10-24

 In this issue Vol. 3 No. 1 (2024): February, we have processed 21 submitted manuscripts. 3 articles were declined after initial review by the editor, 2 article was declined after the peer review process, and 16 articles were published.


In this issue Vol. 3 No. 1 (2024): February, all of the published articles were authored/co-authored by 24 authors, from 1 Institutions, and 1 Country, i.e. Universitas 17 Agustus 1945 (Indonesia)

 (Download Full Issue)

https://doi.org/10.55047/ijateis.v3i1

Articles
EVALUATION OF THE APPLICATION OF SMK3 IN PCI GIRDER ERECTION WORK USING A CRAWLER CRANE
(Case Study: Construction of Probolinggo - Banyuwangi Toll Road Package 1 Sta -3+881 - Sta 09+00 At Bridge Sta -3+256 Span 40.8 Meters)
Djoko Prasetyo* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Sajiyo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 533 Downloads 320 Pages 1-9
EVALUATION OF THE APPLICATION OF SMK3 IN PCI GIRDER ERECTION WORK USING A CRAWLER CRANE
(Case Study: Construction of Probolinggo - Banyuwangi Toll Road Package 1 Sta -3+881 - Sta 09+00 At Bridge Sta -3+256 Span 40.8 Meters)
Djoko Prasetyo* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Sajiyo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
533 320 1-9
RISK ANALYSIS OF STEEL BOX GIRDER INSTALLATION USING HIRARC METHOD
(Case Study: Aloha Sidoarjo Flyover Construction Project)
Karunia Az Zahra* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Sajiyo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 682 Downloads 409 Pages 10-28
RISK ANALYSIS OF STEEL BOX GIRDER INSTALLATION USING HIRARC METHOD
(Case Study: Aloha Sidoarjo Flyover Construction Project)
Karunia Az Zahra* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Sajiyo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
682 409 10-28
RUSUNAWA INVESTMENT ANALYSIS IN TAMBAK WEDI DISTRICT, KENJERAN DISTRICT, SURABAYA CITY
Hayadi Agus Mawardianto* - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Laksono Djoko Nugroho - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Haris Muhammadun - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 505 Downloads 354 Pages 29-40
RUSUNAWA INVESTMENT ANALYSIS IN TAMBAK WEDI DISTRICT, KENJERAN DISTRICT, SURABAYA CITY
Hayadi Agus Mawardianto* - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Laksono Djoko Nugroho - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Haris Muhammadun - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
505 354 29-40
OPTIMIZATION OF INTERSECTION PERFORMANCE AND VEHICLE TRAFFIC FLOW AT INTERSECTION FOUR DHOHO PLAZA KEDIRI CITY USING MKJI METHOD 1997
Evita Fitrianis Hidiyati* - Magister Civil Engineering 17 Agustus 1945 Surabaya University Laksono Djoko Nugroho - Magister Civil Engineering 17 Agustus 1945 Surabaya University Haris Muhammadun - Magister Civil Engineering 17 Agustus 1945 Surabaya University
Views 582 Downloads 347 Pages 41-56
OPTIMIZATION OF INTERSECTION PERFORMANCE AND VEHICLE TRAFFIC FLOW AT INTERSECTION FOUR DHOHO PLAZA KEDIRI CITY USING MKJI METHOD 1997
Evita Fitrianis Hidiyati* - Magister Civil Engineering 17 Agustus 1945 Surabaya University Laksono Djoko Nugroho - Magister Civil Engineering 17 Agustus 1945 Surabaya University Haris Muhammadun - Magister Civil Engineering 17 Agustus 1945 Surabaya University
582 347 41-56
TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD
Ijaz Adam* - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Hanie Teki TJendani - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
Views 616 Downloads 337 Pages 57-73
TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD
Ijaz Adam* - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Hanie Teki TJendani - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
616 337 57-73
COMPARATIVE ANALYSIS OF COSTS AND TIMES OF RED BRICK AND LIGHT BRICK WORK ON THE MADRASAH MALLIMIN MUALLIMAT TAMBAK BERAS JOMBANG BUILDING PROJECT
Anindya Novita Sari* - Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - University 17 August 1945 Surabaya Risma Marleno - University 17 August 1945 Surabaya
Views 304 Downloads 312 Pages 74-81
COMPARATIVE ANALYSIS OF COSTS AND TIMES OF RED BRICK AND LIGHT BRICK WORK ON THE MADRASAH MALLIMIN MUALLIMAT TAMBAK BERAS JOMBANG BUILDING PROJECT
Anindya Novita Sari* - Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - University 17 August 1945 Surabaya Risma Marleno - University 17 August 1945 Surabaya
304 312 74-81
TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD (CASE STUDY: TANJUNG UNCANG JETTY CONSTRUCTION PROJECT BATAM CITY)
Harisa Ramadhani Putra* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Koespiadi - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 659 Downloads 472 Pages 82-91
TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD (CASE STUDY: TANJUNG UNCANG JETTY CONSTRUCTION PROJECT BATAM CITY)
Harisa Ramadhani Putra* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Koespiadi - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
659 472 82-91
COST AND TIME ANALYSIS USING EARNED VALUE METHOD BUILDING CONSTRUCTION OF DISTANCE LEARNING PROGRAM UNITS OF SURABAYA OPEN UNIVERSITY PHASE II
Mochamad Ranoe Asmoro* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 537 Downloads 373 Pages 92-104
COST AND TIME ANALYSIS USING EARNED VALUE METHOD BUILDING CONSTRUCTION OF DISTANCE LEARNING PROGRAM UNITS OF SURABAYA OPEN UNIVERSITY PHASE II
Mochamad Ranoe Asmoro* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
537 373 92-104
ANALYSIS OF IMPLEMENTATION DELAYS USING THE EARNED VALUE METHOD (ON THE PURWOSARI - SEKARMOJO ROAD WORKS, PASURUAN DISTRICT)
Pandji Thoha S. Balido* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 653 Downloads 361 Pages 105-118
ANALYSIS OF IMPLEMENTATION DELAYS USING THE EARNED VALUE METHOD (ON THE PURWOSARI - SEKARMOJO ROAD WORKS, PASURUAN DISTRICT)
Pandji Thoha S. Balido* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
653 361 105-118
COST AND TIME ANALYSIS USING EARNED VALUE METHOD ON THE CONSTRUCTION OF THE NATIONAL KEDIRI AIRPORT ACCESS ROAD PHASE 1 KEDIRI - NGANJUK
Ichsan Yanuansyah Pramadha* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 562 Downloads 392 Pages 119-130
COST AND TIME ANALYSIS USING EARNED VALUE METHOD ON THE CONSTRUCTION OF THE NATIONAL KEDIRI AIRPORT ACCESS ROAD PHASE 1 KEDIRI - NGANJUK
Ichsan Yanuansyah Pramadha* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
562 392 119-130
TECHNICAL AND COST ANALYSIS OF FLOOD CONTROL PLANNING USING THE ECODRAINS-BASED SPONGE VILLAGE MODEL IN THE KAMONING SAMPANG WATERSHED
Zaiful Muqaddas* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 512 Downloads 302 Pages 131-140
TECHNICAL AND COST ANALYSIS OF FLOOD CONTROL PLANNING USING THE ECODRAINS-BASED SPONGE VILLAGE MODEL IN THE KAMONING SAMPANG WATERSHED
Zaiful Muqaddas* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
512 302 131-140
ANALYSIS OF CONTRACT CHANGE ORDER (CCO) COSTS IN BUILDING CONSTRUCTION PROJECTS
Wahyu Pratondo W* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 811 Downloads 454 Pages 141-154
ANALYSIS OF CONTRACT CHANGE ORDER (CCO) COSTS IN BUILDING CONSTRUCTION PROJECTS
Wahyu Pratondo W* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
811 454 141-154
DESIGN REVIEW ANALYSIS OF THE USE OF STONE HEAPS FROM STONE EXCAVATIONS IN THE PROBOLINGGO – BANYUWANGI TOLL ROAD CONSTRUCTION PROJECT SECTION 3
Muhammad Ali Hasymi Abdul Q* - University 17 August 1945 Surabaya Budi Witjaksana - University 17 August 1945 Surabaya Hanie Teki Tjendani - University 17 August 1945 Surabaya
Views 555 Downloads 339 Pages 155-166
DESIGN REVIEW ANALYSIS OF THE USE OF STONE HEAPS FROM STONE EXCAVATIONS IN THE PROBOLINGGO – BANYUWANGI TOLL ROAD CONSTRUCTION PROJECT SECTION 3
Muhammad Ali Hasymi Abdul Q* - University 17 August 1945 Surabaya Budi Witjaksana - University 17 August 1945 Surabaya Hanie Teki Tjendani - University 17 August 1945 Surabaya
555 339 155-166
INVESTMENT ANALYSIS ON THE DEVELOPMENT OF WATU ULO FISHING PORT BASED ON FINANCIAL ASPECTS AND SENSITIVITY ASPECTS
Tati Mushalihati Ratuinsani* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Haris Muhammadun - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Laksono Djoko Nugroho - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 417 Downloads 284 Pages 167-175
INVESTMENT ANALYSIS ON THE DEVELOPMENT OF WATU ULO FISHING PORT BASED ON FINANCIAL ASPECTS AND SENSITIVITY ASPECTS
Tati Mushalihati Ratuinsani* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Haris Muhammadun - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Laksono Djoko Nugroho - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
417 284 167-175
ANALYSIS OF GOVERNMENT AND NON-GOVERNMENT INVESTMENT IN TPASR PROBOLINGGO DEVELOPMENT
Aditya Irwanto* - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Koespiadi - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
Views 412 Downloads 257 Pages 176-190
ANALYSIS OF GOVERNMENT AND NON-GOVERNMENT INVESTMENT IN TPASR PROBOLINGGO DEVELOPMENT
Aditya Irwanto* - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Koespiadi - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
412 257 176-190
COST AND TIME ANALYSIS OF THE FAST FOOD RESTAURANT BUILDING CONSTRUCTION PROJECT IN PONTIANAK USING CRASHING METHOD
Oskar Ezra Alan Muin* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 641 Downloads 359 Pages 191-203
COST AND TIME ANALYSIS OF THE FAST FOOD RESTAURANT BUILDING CONSTRUCTION PROJECT IN PONTIANAK USING CRASHING METHOD
Oskar Ezra Alan Muin* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
641 359 191-203