Vol. 3 No. 1 (2024): FEBRUARY

Published: 2023-10-24

In this issue Vol. 3 No. 1 (2024): February, we have processed 21 submitted manuscripts. 3 articles were declined after initial review by the editor, 2 articles were declined after the peer review process, and 16 articles were published.


In this issue Vol. 3 No. 1 (2024): February, all of the published articles were authored/co-authored by 24 authors, from 1 Institution, and 1 Country, i.e., Universitas 17 Agustus 1945 (Indonesia).

 (Download Full Issue)

https://doi.org/10.55047/ijateis.v3i1

Articles
EVALUATION OF THE APPLICATION OF SMK3 IN PCI GIRDER ERECTION WORK USING A CRAWLER CRANE
(Case Study: Construction of Probolinggo - Banyuwangi Toll Road Package 1 Sta -3+881 - Sta 09+00 At Bridge Sta -3+256 Span 40.8 Meters)
Djoko Prasetyo* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Sajiyo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 535 Downloads 325 Pages 1-9
EVALUATION OF THE APPLICATION OF SMK3 IN PCI GIRDER ERECTION WORK USING A CRAWLER CRANE
(Case Study: Construction of Probolinggo - Banyuwangi Toll Road Package 1 Sta -3+881 - Sta 09+00 At Bridge Sta -3+256 Span 40.8 Meters)
Djoko Prasetyo* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Sajiyo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
535 325 1-9
RISK ANALYSIS OF STEEL BOX GIRDER INSTALLATION USING HIRARC METHOD
(Case Study: Aloha Sidoarjo Flyover Construction Project)
Karunia Az Zahra* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Sajiyo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 686 Downloads 412 Pages 10-28
RISK ANALYSIS OF STEEL BOX GIRDER INSTALLATION USING HIRARC METHOD
(Case Study: Aloha Sidoarjo Flyover Construction Project)
Karunia Az Zahra* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Sajiyo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
686 412 10-28
RUSUNAWA INVESTMENT ANALYSIS IN TAMBAK WEDI DISTRICT, KENJERAN DISTRICT, SURABAYA CITY
Hayadi Agus Mawardianto* - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Laksono Djoko Nugroho - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Haris Muhammadun - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 506 Downloads 356 Pages 29-40
RUSUNAWA INVESTMENT ANALYSIS IN TAMBAK WEDI DISTRICT, KENJERAN DISTRICT, SURABAYA CITY
Hayadi Agus Mawardianto* - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Laksono Djoko Nugroho - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Haris Muhammadun - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
506 356 29-40
OPTIMIZATION OF INTERSECTION PERFORMANCE AND VEHICLE TRAFFIC FLOW AT INTERSECTION FOUR DHOHO PLAZA KEDIRI CITY USING MKJI METHOD 1997
Evita Fitrianis Hidiyati* - Magister Civil Engineering 17 Agustus 1945 Surabaya University Laksono Djoko Nugroho - Magister Civil Engineering 17 Agustus 1945 Surabaya University Haris Muhammadun - Magister Civil Engineering 17 Agustus 1945 Surabaya University
Views 585 Downloads 348 Pages 41-56
OPTIMIZATION OF INTERSECTION PERFORMANCE AND VEHICLE TRAFFIC FLOW AT INTERSECTION FOUR DHOHO PLAZA KEDIRI CITY USING MKJI METHOD 1997
Evita Fitrianis Hidiyati* - Magister Civil Engineering 17 Agustus 1945 Surabaya University Laksono Djoko Nugroho - Magister Civil Engineering 17 Agustus 1945 Surabaya University Haris Muhammadun - Magister Civil Engineering 17 Agustus 1945 Surabaya University
585 348 41-56
TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD
Ijaz Adam* - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Hanie Teki TJendani - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
Views 622 Downloads 339 Pages 57-73
TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD
Ijaz Adam* - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Hanie Teki TJendani - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
622 339 57-73
COMPARATIVE ANALYSIS OF COSTS AND TIMES OF RED BRICK AND LIGHT BRICK WORK ON THE MADRASAH MALLIMIN MUALLIMAT TAMBAK BERAS JOMBANG BUILDING PROJECT
Anindya Novita Sari* - Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - University 17 August 1945 Surabaya Risma Marleno - University 17 August 1945 Surabaya
Views 304 Downloads 314 Pages 74-81
COMPARATIVE ANALYSIS OF COSTS AND TIMES OF RED BRICK AND LIGHT BRICK WORK ON THE MADRASAH MALLIMIN MUALLIMAT TAMBAK BERAS JOMBANG BUILDING PROJECT
Anindya Novita Sari* - Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - University 17 August 1945 Surabaya Risma Marleno - University 17 August 1945 Surabaya
304 314 74-81
TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD (CASE STUDY: TANJUNG UNCANG JETTY CONSTRUCTION PROJECT BATAM CITY)
Harisa Ramadhani Putra* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Koespiadi - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 663 Downloads 475 Pages 82-91
TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD (CASE STUDY: TANJUNG UNCANG JETTY CONSTRUCTION PROJECT BATAM CITY)
Harisa Ramadhani Putra* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Koespiadi - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
663 475 82-91
COST AND TIME ANALYSIS USING EARNED VALUE METHOD BUILDING CONSTRUCTION OF DISTANCE LEARNING PROGRAM UNITS OF SURABAYA OPEN UNIVERSITY PHASE II
Mochamad Ranoe Asmoro* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 539 Downloads 374 Pages 92-104
COST AND TIME ANALYSIS USING EARNED VALUE METHOD BUILDING CONSTRUCTION OF DISTANCE LEARNING PROGRAM UNITS OF SURABAYA OPEN UNIVERSITY PHASE II
Mochamad Ranoe Asmoro* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
539 374 92-104
ANALYSIS OF IMPLEMENTATION DELAYS USING THE EARNED VALUE METHOD (ON THE PURWOSARI - SEKARMOJO ROAD WORKS, PASURUAN DISTRICT)
Pandji Thoha S. Balido* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 664 Downloads 363 Pages 105-118
ANALYSIS OF IMPLEMENTATION DELAYS USING THE EARNED VALUE METHOD (ON THE PURWOSARI - SEKARMOJO ROAD WORKS, PASURUAN DISTRICT)
Pandji Thoha S. Balido* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
664 363 105-118
COST AND TIME ANALYSIS USING EARNED VALUE METHOD ON THE CONSTRUCTION OF THE NATIONAL KEDIRI AIRPORT ACCESS ROAD PHASE 1 KEDIRI - NGANJUK
Ichsan Yanuansyah Pramadha* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 564 Downloads 394 Pages 119-130
COST AND TIME ANALYSIS USING EARNED VALUE METHOD ON THE CONSTRUCTION OF THE NATIONAL KEDIRI AIRPORT ACCESS ROAD PHASE 1 KEDIRI - NGANJUK
Ichsan Yanuansyah Pramadha* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
564 394 119-130
TECHNICAL AND COST ANALYSIS OF FLOOD CONTROL PLANNING USING THE ECODRAINS-BASED SPONGE VILLAGE MODEL IN THE KAMONING SAMPANG WATERSHED
Zaiful Muqaddas* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 514 Downloads 304 Pages 131-140
TECHNICAL AND COST ANALYSIS OF FLOOD CONTROL PLANNING USING THE ECODRAINS-BASED SPONGE VILLAGE MODEL IN THE KAMONING SAMPANG WATERSHED
Zaiful Muqaddas* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
514 304 131-140
ANALYSIS OF CONTRACT CHANGE ORDER (CCO) COSTS IN BUILDING CONSTRUCTION PROJECTS
Wahyu Pratondo W* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 820 Downloads 457 Pages 141-154
ANALYSIS OF CONTRACT CHANGE ORDER (CCO) COSTS IN BUILDING CONSTRUCTION PROJECTS
Wahyu Pratondo W* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
820 457 141-154
DESIGN REVIEW ANALYSIS OF THE USE OF STONE HEAPS FROM STONE EXCAVATIONS IN THE PROBOLINGGO – BANYUWANGI TOLL ROAD CONSTRUCTION PROJECT SECTION 3
Muhammad Ali Hasymi Abdul Q* - University 17 August 1945 Surabaya Budi Witjaksana - University 17 August 1945 Surabaya Hanie Teki Tjendani - University 17 August 1945 Surabaya
Views 560 Downloads 341 Pages 155-166
DESIGN REVIEW ANALYSIS OF THE USE OF STONE HEAPS FROM STONE EXCAVATIONS IN THE PROBOLINGGO – BANYUWANGI TOLL ROAD CONSTRUCTION PROJECT SECTION 3
Muhammad Ali Hasymi Abdul Q* - University 17 August 1945 Surabaya Budi Witjaksana - University 17 August 1945 Surabaya Hanie Teki Tjendani - University 17 August 1945 Surabaya
560 341 155-166
INVESTMENT ANALYSIS ON THE DEVELOPMENT OF WATU ULO FISHING PORT BASED ON FINANCIAL ASPECTS AND SENSITIVITY ASPECTS
Tati Mushalihati Ratuinsani* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Haris Muhammadun - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Laksono Djoko Nugroho - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 419 Downloads 286 Pages 167-175
INVESTMENT ANALYSIS ON THE DEVELOPMENT OF WATU ULO FISHING PORT BASED ON FINANCIAL ASPECTS AND SENSITIVITY ASPECTS
Tati Mushalihati Ratuinsani* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Haris Muhammadun - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Laksono Djoko Nugroho - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
419 286 167-175
ANALYSIS OF GOVERNMENT AND NON-GOVERNMENT INVESTMENT IN TPASR PROBOLINGGO DEVELOPMENT
Aditya Irwanto* - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Koespiadi - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
Views 415 Downloads 260 Pages 176-190
ANALYSIS OF GOVERNMENT AND NON-GOVERNMENT INVESTMENT IN TPASR PROBOLINGGO DEVELOPMENT
Aditya Irwanto* - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Koespiadi - Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
415 260 176-190
COST AND TIME ANALYSIS OF THE FAST FOOD RESTAURANT BUILDING CONSTRUCTION PROJECT IN PONTIANAK USING CRASHING METHOD
Oskar Ezra Alan Muin* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 642 Downloads 364 Pages 191-203
COST AND TIME ANALYSIS OF THE FAST FOOD RESTAURANT BUILDING CONSTRUCTION PROJECT IN PONTIANAK USING CRASHING METHOD
Oskar Ezra Alan Muin* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
642 364 191-203