TIME PERFORMANCE ANALYSIS ON THE CONSTRUCTION PROJECT OF SUBALI BRIDGE IN SUTOJAYAN DISTRICT (D.G.008), BLITAR REGENCY, USING THE EARNED VALUE METHODOLOGY APPROACH
Main Article Content
One of the project types is the Construction Project. The main activity components of this type of project consist of feasibility assessment, engineering design, procurement and construction. In construction projects very often delays occur where the realization in the field does not match the schedule of the implementation plan, due to several factors that occur, even though a careful plan has been prepared but in practice in the field there are still many problems in implementation. The purpose of this study was to determine the performance of time in the implementation that took place from week -1 to week 17 on the Subali Bridge Construction project, Sutojayan Kec. (D.G.008), Blitar Regency using Earned Value. From the results of the analysis it can be seen that the costs incurred are lower than the planned costs, this can be seen in the CPI value of 1.28 while the implementation time is slower than the planned schedule indicated by the SPI value of 0.71.
Amin, B., Anwar, C., & Miswardi, T. (2019). Evaluation Of Cost And Time Control In Lhokseumawe City Improvement Project Using Earned Value Method (Case Study Street Alue Raya-Line Pipa). Iop Conference Series: Materials Science And Engineering, 536(1), 12105.
Ariane, F., & Dinariana, D. (2018). Earned Value Analysis Pada Pengendalian Waktu Proyek Venue Layar Di Dki Jakarta. Ikra-Ith Teknologi Jurnal Sains Dan Teknologi, 2(3), 51–54.
Iskandar, B. P. (2017). Analysis Of Delays In The Usilimo–Karubaga–Mulia Ii Road Project, Puncak Jaya Regency Papua Province. Underpass Journal Of Civil Engineering, Applied Sciences, And Technology, 1(1), 25–32.
Junaidi, J., Supriyadi, S., Candradewi, A., & Pradikdya, A. B. (2022). Kajian Evaluasi Biaya Dan Waktu Dalam Penanganan Keterlambatan Proyek Menggunakan Metode Earned Value Analysis (Studi Kasus: Proyek Pembangunan Jalan Layang Akses Bandara Jenderal Ahmad Yani Semarang). Bangun Rekaprima: Majalah Ilmiah Pengembangan Rekayasa, Sosial Dan Humaniora, 8(1, April), 51–59.
Mh, A. A. P. (2021). Analisis Kinerja Biaya Dan Waktu Dengan Menggunakan Metode Earned Value. Ug Journal, 14(9).
Sakinah, K. N. (2021). Analisis Kinerja Biaya Dan Waktu Menggunakan Metode Earned Value Dan Earned Schedule Pada Proyek Pembangunan Villa Pasir Angin Puncak-Bogor. Akselerasi: Jurnal Ilmiah Teknik Sipil, 3(1).
Susanti, B., Melisah, M., & Juliantina, I. (2019). Penerapan Konsep Earned Value Pada Proyek Konstruksi Jalan Tol (Studi Kasus Ruas Jalan Tol Kayuagung-Palembang-Betung). Jurnal Rekayasa Sipil, 15(1), 12–20.
Thoengsal, J., & Tumpu, M. (2022). Analysis Of Project Cost And Time Performance Control Using Earned Value Method Analysis (Evm-A)(Case Study Of Concrete Road Construction Project). International Journal Of Engineering Business And Social Science, 1(02), 80–85.