ANALYSIS OF FACTORS CAUSED FOR DELAYING CONSTRUCTION ROAD REHABILITATION AND MAINTENANCE IN KEJAYAN PURWOSARI’S (LINK 197) PROJECT DUE TO COVID-19 PANDEMIC
Main Article Content
Implementation of Construction Projects that run within a limited time must be removed from the factors that cause project delays to run optimally and appropriately. This study aims to analyze the factors causing delays in road rehabilitation and maintenance in Kejayan Purwosari (Link 197) construction projects due to the Covid-19 pandemic. The study population consist of 80 people and the number of research samples is the total population. The data collection technique is done by distributing questionnaires. Techniques for analyzing research data using Partial Least Square (PLS). The results of the study prove that the factors of Manpower, Materials and Equipment have no significant effect on Project Delay. Meanwhile, the factors of Construction Method, Relationship and Time and Control have a significant effect on Project Delay.
Aji, M. B., & Yudha, A. (2021). Analisis Faktor-Faktor Penyebab Keterlambatan dan Corrective Action Yang Dilakukan pada proyek pembangunan Apartemen Tamansari Cendekia Semarang Di Masa Pandemi Covid-19. Universitas Diponegoro.
Ariyanto, A. S., Kamila, K. A. P., Supriyadi, Utomo, M. B., & Wildana Latif Mahmudi. (2019). Pengaruh Keterlambatan Material Terhadap. Bangun Rekaprima, 05(2), 51–58.
Boy, W., Erlindo, R., & Fitrah, R. A. (2021). Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Gedung Kuliah Pada Masa Pandemi Covid 19. Jurnal Rivet, 1(01), 57–64. https://doi.org/10.47233/rivet.v1i01.231
Brahmantariguna, I. A. A. (2015). Hubungan Kompetensi Project Manager Terhadap Keberhasilan Proyek Konstruksi Gedung. Universitas Udayana.
Christianto, G. C. (2015). Keberhasilan Proyek Ditinjau Dari Aspek Waktu (Studi Kasus Pada Proyek Pembangunan Gedung). Universitas Atma Jaya Yogyakarta.
Dimyati, H., & Nurjamanuddin, K. (2014). Manajemen Proyek. CV Pustaka Setia.
Ervianto, W. I. (2005). Manajemen Proyek Konstruksi. Penerbit Andi.
Ghozali, I. (2016). Aplikasi Analisis multivariete dengan program IBM SPSS 23 (Edisi 8). Cetakan Ke VIII. Semarang: Badan Penerbit Universitas Diponegoro, 96.
Hendriko. (2016). Analisis Faktor – Faktor Dalam ISO 9001:2008 Yang Berpengaruh Terhadap Kinerja Karyawan Pada Kontraktor Proyek Apartemen High Rise Di Jakarta. Universitas Tarumanagara.
Ismawanto, I. (2019). Analisis Faktor – Faktor Penyebab Keterlambatan Penyelesaian Pekerjaan Pelebaran/Peningkatan Jalan (Studi Kasus Jalan Kertosono – Kediri – Tulungagung). Universitas 17 Agustus 1945 Surabaya.
Rossela, A., & Mahfuz, H. (2021). Analisis Faktor Penyebab Kendala Pada Proyek Peningkatan Jalan ( Studi Kasus : Jalan Simpang Marina -Simpang Base Camp Kota Batam ). ConCEPTt (Conference on Community Engagement Project), 1(1), 67–70.
Widyarsana, I. P. (2015). Karakteristik Manajer Proyek Terhadap Kualitas Kinerja Pelaksanaan Konstruksi Gedung di Kabupaten Badung. Universitas Udayana.