Vol. 2 No. 4 (2023): NOVEMBER

Published: 2023-10-23

In this issue Vol. 2 No. 4 (2023): November, we have processed 21 submitted manuscripts. 3 articles were declined after initial review by the editor, 2 articles were declined after the peer review process, and 16 articles were published.


In this issue Vol. 2 No. 4 (2023): November, all of the published articles were authored/co-authored by 31 authors, from 4 Institutions, and 1 Country, i.e., Universitas Abulyatama (Indonesia), State Polytechnic of Malang (Indonesia), Universitas Islam Kalimantan (Indonesia), and Universitas 17 Agustus 1945 (Indonesia)

 (Download Full Issue)

https://doi.org/10.55047/ijateis.v2i4

Articles
THE INFLUENCE OF GREEN COCONUT WATER (COCOS NUCIFERA LINN VARIETY. VIRIDIS) ON THE REDUCTION OF MENSTRUAL PAIN (DYSMENORRHEA) IN FEMALE STUDENTS OF MTSS BABUN NAJAH BANDA ACEH
Nanda Desreza* - Nursing Science Study Program, Universitas Abulyatama, Aceh Besar, Indonesia Novi Diana - Nursing Science Study Program, Universitas Abulyatama, Aceh Besar, Indonesia Syarifah Masthura - Nursing Science Study Program, Universitas Abulyatama, Aceh Besar, Indonesia
Views 348 Downloads 425 Pages 233-241
THE INFLUENCE OF GREEN COCONUT WATER (COCOS NUCIFERA LINN VARIETY. VIRIDIS) ON THE REDUCTION OF MENSTRUAL PAIN (DYSMENORRHEA) IN FEMALE STUDENTS OF MTSS BABUN NAJAH BANDA ACEH
Nanda Desreza* - Nursing Science Study Program, Universitas Abulyatama, Aceh Besar, Indonesia Novi Diana - Nursing Science Study Program, Universitas Abulyatama, Aceh Besar, Indonesia Syarifah Masthura - Nursing Science Study Program, Universitas Abulyatama, Aceh Besar, Indonesia
348 425 233-241
SEMANTIC AND NATURAL LANGUAGE PROCESSING DEVELOPMENT APPLICATIONS FOR CHATBOTS TO ENHANCE ONLINE STORE CUSTOMER SERVICE
Yosi Afandi - Departement of Business Administration, State Polytechnic of Malang, Malang, Indonesia Maskur* - Departement of Business Administration, State Polytechnic of Malang, Malang, Indonesia Nilawati Fiernaningsih - Departement of Business Administration, State Polytechnic of Malang, Malang, Indonesia Ahmad Fauzi - Departement of Business Administration, State Polytechnic of Malang, Malang, Indonesia
Views 547 Downloads 497 Pages 242-255
SEMANTIC AND NATURAL LANGUAGE PROCESSING DEVELOPMENT APPLICATIONS FOR CHATBOTS TO ENHANCE ONLINE STORE CUSTOMER SERVICE
Yosi Afandi - Departement of Business Administration, State Polytechnic of Malang, Malang, Indonesia Maskur* - Departement of Business Administration, State Polytechnic of Malang, Malang, Indonesia Nilawati Fiernaningsih - Departement of Business Administration, State Polytechnic of Malang, Malang, Indonesia Ahmad Fauzi - Departement of Business Administration, State Polytechnic of Malang, Malang, Indonesia
547 497 242-255
HUMAN RESOURCE AND ARCHIVE MANAGEMENT APPLICATION FOR THE REGIONAL CIVIL SERVICE POLICE AND FIRE DEPARTMENT IN TAPIN
Ferdy Yudillah Akbar* - Informatics Engineering, 55201, Faculty of Information Technology, Universitas Islam Kalimantan (UNISKA), Muhammad Arsyad Al-banjary Banjarmasin Hasanuddin - Informatics Engineering, 55201, Faculty of Information Technology, Universitas Islam Kalimantan (UNISKA), Muhammad Arsyad Al-banjary Banjarmasin Fitrah Yuridka - Informatics Engineering, 55201, Faculty of Information Technology, Universitas Islam Kalimantan (UNISKA), Muhammad Arsyad Al-banjary Banjarmasin
Views 310 Downloads 232 Pages 256-272
HUMAN RESOURCE AND ARCHIVE MANAGEMENT APPLICATION FOR THE REGIONAL CIVIL SERVICE POLICE AND FIRE DEPARTMENT IN TAPIN
Ferdy Yudillah Akbar* - Informatics Engineering, 55201, Faculty of Information Technology, Universitas Islam Kalimantan (UNISKA), Muhammad Arsyad Al-banjary Banjarmasin Hasanuddin - Informatics Engineering, 55201, Faculty of Information Technology, Universitas Islam Kalimantan (UNISKA), Muhammad Arsyad Al-banjary Banjarmasin Fitrah Yuridka - Informatics Engineering, 55201, Faculty of Information Technology, Universitas Islam Kalimantan (UNISKA), Muhammad Arsyad Al-banjary Banjarmasin
310 232 256-272
TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD WITH ADDITIONAL WORKING HOURS IN THE CONSTRUCTION PROJECT OF KAPAS – GLENDENG 8 BRIDGE, BOJONEGORO DISTRICT
Subkhan Ariyanto* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 558 Downloads 273 Pages 273-293
TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD WITH ADDITIONAL WORKING HOURS IN THE CONSTRUCTION PROJECT OF KAPAS – GLENDENG 8 BRIDGE, BOJONEGORO DISTRICT
Subkhan Ariyanto* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Hanie Teki Tjendani - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
558 273 273-293
COST PERFORMANCE ANALYSIS USING EARNED VALUE METHOD ON PRESERVATION OF EXIT TOLL ROAD SECTION 5 PANDAAN MALANG
Amalia Fathimah Azh Zhahra Mughni* - Master of Civil Engineering Faculty of Engineering 17 Agustus 1945 Surabaya University Hanie Teki Tjendani - Master of Civil Engineering Faculty of Engineering 17 Agustus 1945 Surabaya University Budi Witjaksana - Master of Civil Engineering Faculty of Engineering 17 Agustus 1945 Surabaya University
Views 584 Downloads 341 Pages 294-311
COST PERFORMANCE ANALYSIS USING EARNED VALUE METHOD ON PRESERVATION OF EXIT TOLL ROAD SECTION 5 PANDAAN MALANG
Amalia Fathimah Azh Zhahra Mughni* - Master of Civil Engineering Faculty of Engineering 17 Agustus 1945 Surabaya University Hanie Teki Tjendani - Master of Civil Engineering Faculty of Engineering 17 Agustus 1945 Surabaya University Budi Witjaksana - Master of Civil Engineering Faculty of Engineering 17 Agustus 1945 Surabaya University
584 341 294-311
ANALYSIS OF FACTORS INHIBITING THE IMPLEMENTATION OF SMK3 IN THE WIDENING PROJECT OF KAPAS – GLENDENG BRIDGE, BOJONEGORO REGENCY
Menik Ariyanti* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Sajiyo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Esti Wulandari - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 566 Downloads 313 Pages 312-320
ANALYSIS OF FACTORS INHIBITING THE IMPLEMENTATION OF SMK3 IN THE WIDENING PROJECT OF KAPAS – GLENDENG BRIDGE, BOJONEGORO REGENCY
Menik Ariyanti* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Sajiyo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Esti Wulandari - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
566 313 312-320
COMPARISON OF FEASIBILITY ANALYSIS OF INVESTMENT WITH GRAVITY SYSTEM AND PUMPING SYSTEM IN THE IKK IBU WATER SUPPLY, WEST HALMAHERA REGENCY
Baskoro Adhi Prasetyo* - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Haris Muhammadun - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Laksono Djoko Nugroho - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 482 Downloads 305 Pages 321-333
COMPARISON OF FEASIBILITY ANALYSIS OF INVESTMENT WITH GRAVITY SYSTEM AND PUMPING SYSTEM IN THE IKK IBU WATER SUPPLY, WEST HALMAHERA REGENCY
Baskoro Adhi Prasetyo* - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Haris Muhammadun - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Laksono Djoko Nugroho - Master of Civil Engineering, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
482 305 321-333
ANALYSIS OF RISK MANAGEMENT IN BUILDING WORKERS OF SMAN 5 BRAWIJAYA BUILDING KEDIRI
Endik Setiawan* - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Hanie Teki TJendani - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
Views 499 Downloads 288 Pages 334-346
ANALYSIS OF RISK MANAGEMENT IN BUILDING WORKERS OF SMAN 5 BRAWIJAYA BUILDING KEDIRI
Endik Setiawan* - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Hanie Teki TJendani - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
499 288 334-346
COST ANALYSIS ON THE CONSTRUCTION OF SPORTS FACILITIES IN KEDEWAN SUB-DISTRICT, BOJONEGORO DISTRICT WITH EVM (EARNED VALUE METHOD)
Sanda Praja Riduwan* - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Hanie Teki TJendani - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
Views 541 Downloads 377 Pages 347-365
COST ANALYSIS ON THE CONSTRUCTION OF SPORTS FACILITIES IN KEDEWAN SUB-DISTRICT, BOJONEGORO DISTRICT WITH EVM (EARNED VALUE METHOD)
Sanda Praja Riduwan* - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Budi Witjaksana - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya Hanie Teki TJendani - Program Studi Magister Teknik Sipil, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
541 377 347-365
ACCELERATION ANALYSIS USING THE CRASHING METHOD IN THE SDN KUTISARI 2 DEVELOPMENT PROJECT
Muhammad Bayu Firdaus* - Universitas 17 Agustus 1945, Surabaya Hanie Teki Tjendani - University 17 August 1945, Surabaya Budi Witjaksana - University 17 August 1945, Surabaya
Views 534 Downloads 383 Pages 366-375
ACCELERATION ANALYSIS USING THE CRASHING METHOD IN THE SDN KUTISARI 2 DEVELOPMENT PROJECT
Muhammad Bayu Firdaus* - Universitas 17 Agustus 1945, Surabaya Hanie Teki Tjendani - University 17 August 1945, Surabaya Budi Witjaksana - University 17 August 1945, Surabaya
534 383 366-375
STUDY OF COST AND TIME ANALYSIS USING THE TIME COST TRADE-OFF (TCTO) METHOD IN THE CONSTRUCTION PROJECT OF THE OFFICE BUILDING OF A GOVERNMENT AGENCY (OPD) IN PASURUAN
Didik Purnomo* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Risma Marleno - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 508 Downloads 332 Pages 376-386
STUDY OF COST AND TIME ANALYSIS USING THE TIME COST TRADE-OFF (TCTO) METHOD IN THE CONSTRUCTION PROJECT OF THE OFFICE BUILDING OF A GOVERNMENT AGENCY (OPD) IN PASURUAN
Didik Purnomo* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Risma Marleno - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
508 332 376-386
COST AND TIME ANALYSIS USING THE CRASHING METHOD ON THE PROBOLINGGO – BANYUWANGI TOLL ROAD PROJECT PEKET 2: STA 9+000 – 20+200
Budidarma Ardi Nugraha* - Civil Engineering Master's Study Program, Faculty of Engineering, University of 17 August 1945 Surabaya Hanie Teki Tjendani - Civil Engineering Master's Study Program, Faculty of Engineering, University of 17 August 1945 Surabaya Budi Witjaksana - Civil Engineering Master's Study Program, Faculty of Engineering, University of 17 August 1945 Surabaya
Views 667 Downloads 330 Pages 387-399
COST AND TIME ANALYSIS USING THE CRASHING METHOD ON THE PROBOLINGGO – BANYUWANGI TOLL ROAD PROJECT PEKET 2: STA 9+000 – 20+200
Budidarma Ardi Nugraha* - Civil Engineering Master's Study Program, Faculty of Engineering, University of 17 August 1945 Surabaya Hanie Teki Tjendani - Civil Engineering Master's Study Program, Faculty of Engineering, University of 17 August 1945 Surabaya Budi Witjaksana - Civil Engineering Master's Study Program, Faculty of Engineering, University of 17 August 1945 Surabaya
667 330 387-399
COST AND TIME ANALYSIS USING THE EARNED VALUE METHOD IN THE CONSTRUCTION PROJECT OF THE BPBD BUILDING COMPLEX IN PASURUAN DISTRICT
Bagus Cahyono* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Risma Marleno - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 587 Downloads 321 Pages 400-411
COST AND TIME ANALYSIS USING THE EARNED VALUE METHOD IN THE CONSTRUCTION PROJECT OF THE BPBD BUILDING COMPLEX IN PASURUAN DISTRICT
Bagus Cahyono* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Risma Marleno - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
587 321 400-411
EVALUATION OF COST PERFORMANCE IN THE SUTOJAYAN DISTRICT SUBALI BRIDGE CONSTRUCTION PROJECT (D.G.008), BLITAR REGENCY USING EARNED VALUE ANALYSIS METHOD
Dhimas Triadi Setyawan* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Risma Marleno - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 648 Downloads 312 Pages 412-422
EVALUATION OF COST PERFORMANCE IN THE SUTOJAYAN DISTRICT SUBALI BRIDGE CONSTRUCTION PROJECT (D.G.008), BLITAR REGENCY USING EARNED VALUE ANALYSIS METHOD
Dhimas Triadi Setyawan* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Risma Marleno - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
648 312 412-422
COST AND TIME ANALYSIS USING EARNED VALUE METHOD IN ADMINISTRATION BUILDING CONTRUCTION PROJECT AT POLIJE CAMPUS
Dodik Irniawan* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Risma Marleno - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 570 Downloads 332 Pages 423-432
COST AND TIME ANALYSIS USING EARNED VALUE METHOD IN ADMINISTRATION BUILDING CONTRUCTION PROJECT AT POLIJE CAMPUS
Dodik Irniawan* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Risma Marleno - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
570 332 423-432
EVALUATION OF COST AND TIME PERFORMANCE OF KARETAN - SAMBIMULYO ROAD MAINTENANCE PROJECT IN BANYUWANGI DISTRICT
Oscar Harris* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Risma Marleno - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
Views 571 Downloads 320 Pages 433-442
EVALUATION OF COST AND TIME PERFORMANCE OF KARETAN - SAMBIMULYO ROAD MAINTENANCE PROJECT IN BANYUWANGI DISTRICT
Oscar Harris* - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Risma Marleno - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya Wateno Oetomo - Master of Civil Engineering Study Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya
571 320 433-442