TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD
Main Article Content
Indonesia as an archipelago state is still need an equality development with the intention in achieving the goals to fulfill the requirement of structure and infrastructure. The economy that has experiencing growth, it can be seen with the rising of the demand for supply of electricity power whether it is coming from domestic moreover from industrial usages. Lampung Province, as one of the regions which is in a continuation to develop, requires the support of electric power, which at its peak load reaches 1200 MW, while the capacity of the existing power plant can only produce 700 MW, therefore the construction of a 275 kV Gumawang-Lampung 1 SUTET interconnection network with a capacity of up to 2000 MW was established to meet these requirements. Based on the time schedule which noted that the duration of foundation work started with the excavation, concreting until the reaches of it's curing time in 28 days is 42 days in 2023 December 13th is on try to speed up can be curing in 2023 December 8th, so the schedule tower installation in 2023 December 9th will be on time. Due to this delay, the researcher intends to carry out an acceleration analysis starting with preparing a network diagram using the Microsoft Project software, followed by the crashing process by adding groups of workers and tools of any activities on the critical path. The next step is to calculate the crash cost and cost slope values using the time cost trade off (TCTO) method.
Indonesia, M. P. U. R. (N.D.). Peraturan Menteri Pekerjaan Umum Republik Indonesia Nomor: 11/Prt/M/2013 Tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum.
Okayana. (2022). Teknologi Pv (Photovoltaic) : Mengubah Cahaya Matahari Menjadi Listrik. Kementrian Perhubungan Direktorat Jenderal Pehubungan Laut Distrik Navigasi Tipe A Kelas Ii Benoa. 13 November 2023. Https://Www.Asahi.Com/Ajw/Articles/15055646
Pln, P. T. (2019). Rencana Usaha Penyediaan Tenaga Listrik 2019–2028. Pt Pln (Persero): Jakarta, Indonesia.
Prateapusanond, A. (2003). A Comprehensive Practice Of Total Float Pre-Allocation And Management For The Application Of A Cpm-Based Construction Contract. Virginia Tech.
Ratnaningsih, A., Hasanuddin, A., & Hermansa, R. (2019). Penilaian Kriteria Green Building Pada Pembangunan Gedung Isdb Project Berdasarkan Skala Indeks Menggunakan Greenship Versi 1.2 (Studi Kasus: Gedung Engineering Biotechnology Universitas Jember). Berkala Sainstek, 7(2), 59–66.
Rosyid, R., Sarya, G., Beatrix, M., & Oetomo, W. (2020). Studi Analisis Biaya Dan Waktu Menggunakan Metode Time Cost Trade Off (Tcto) Pada Proyek Telkom Manyar-Surabaya. Extrapolasi, 17(1), 20–29.
Saputra, R. A., & Angreni, I. A. A. (2021). Perencanaan Percepatan Pelaksanaan Proyek Apartemen Setiabudi Skygarden Dengan Metode Time Cost Trade Off. Jurnal Tera, 1(1), 1–10.
Soeharto, I. (1999). Manajemen Proyek (Kedua). Erlangga.
Surya Darma. (2019). Mendorong Transisi Menuju Eenergi Terbarukan Demi Masa Depan Yang Berkelanjutan. 28 Agustus 2019. Http://Pojokiklim.Menlhk.Go.Id/Read/Mendorong-Transisi-Menuju-Energi-Terbarukan-Demi-Masa-Depan-Yang-Berkelanjutan
Witjaksana, B., & Tjendani, H. T. (2023). Cost And Time Analysis Of The Construction Of The 275 Kv 2cct Quadruple Zebra Sutet Project Gumawang–Gitet Lampung 1 Using The Time Cost Trade Off Method. Asian Journal Of Engineering, Social And Health, 2(12), 1772–1778.
Yaqin, H. N., Tjendani, H. T., & Witjaksana, B. (2023). Analysis Of The Acceleration Of Time And Cost Of Implementing Building Construction Projects Using The Critical Path Method (Cpm) Method. Devotion Journal Of Community Service, 4(2), 336–346.