TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD (CASE STUDY: TANJUNG UNCANG JETTY CONSTRUCTION PROJECT BATAM CITY)
Main Article Content
Contractors involved in construction projects face the crucial challenge of effectively managing time to ensure the timely completion of the project as stipulated in the contract, if not earlier. Efficient time management not only facilitates adherence to contractual obligations but also transforms incurred costs into profitable outcomes, thereby preventing financial penalties associated with project delays. Consequently, the strategic implementation of acceleration efforts emerges as a pivotal solution to address and mitigate the complexities inherent in construction project timelines. The acceleration process is intricately tied to the identification and prioritization of critical activities within the project schedule. By employing a comprehensive approach that integrates both cost and time analyses, the Crashing method with additional modifications emerges as a valuable tool in this endeavor. The Crashing method involves a strategic acceleration of critical activities, coupled with a meticulous calculation of the additional costs incurred due to the acceleration process. A compelling case study that exemplifies the efficacy of the Crashing method and its supplementary measure of alternative overtime work is evident in the Tanjung Uncang Pier construction project in Batam City. Through the meticulous application of the Crashing method and the incorporation of alternative overtime work, the project's completion timeline was successfully curtailed from the originally delayed schedule of 257 calendar days to a more expedited 244 calendar days.
Ervianto, W. I. (2004). Teori Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: Andi.
Inkiriwang, R. L. (2019). Metode Estimasi Waktu Penyelesaian Konstruksi Bangunan Gedung. Jurnal Sipil Statik, 7(4).
Kusrianto, A. (2013). Panduan Lengkap Memakai Microsoft Office Project 2007. Elex Media Komputindo.
Pratasik, F., Malingkas, G. Y., Arsjad, T. T., & Tarore, H. (2013). Menganalisis Sensitivitas Keterlambatan Durasi Proyek Dengan Metode Cpm (Studi Kasus: Perumahan Puri Kelapa Gading). Jurnal Sipil Statik, 1(9).
Priyo, M., & Sumanto, A. (2016). Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off: Studi Kasus Proyek Pembangunan Prasarana Pengendali Banjir. Semesta Teknika, 19(1), 1–15.
Simatupang, J. S., Dundu, A. K. T., & Sibi, M. (2015). Pengaruh Percepatan Durasi Terhadap Waktu Pada Proyek Konstruksi (Studi Kasus: Pembangunan Persekolahan Eben Haezar Manado). Jurnal Sipil Statik, 3(5).
Soeharto, I. (1997). Manajemen proyek dari konseptual sampai operasional.
Wohon, F. Y., Mandagi, R. J. M., & Pratasis, P. (2015). Analisa Pengaruh Percepatan Durasi Pada Biaya Proyek Menggunakan Program Microsoft Project 2013 (Studi Kasus: Pembangunan Gereja GMIM Syaloom Karombasan). Jurnal Sipil Statik, 3(2).