Road Damage Analysis Using the Analytical Hierarchy Process Method Based on Provincial/District Road Management System as the Basis for Road Handling Program
Main Article Content
Fuad Jauhar Zuhri*
Andi Patriadi
Sajiyo
This study aims to determine the priority order of road handling in Pacitan Regency using the Analytical Hierarchy Process (AHP) method in combination with the Provincial/District Road Management System (PRMS) application. This research involved provincial roads in Pacitan District, with primary data collection through field surveys and AHP questionnaires distributed to experts. The results of the analysis show that combining the PRMS and AHP methods provides a more accurate and objective prioritization order, with the final result identifying the road sections that need the most urgent handling. prioritization of road handling based on AHP and PRMS methods. Based on the criteria weighting results, the Wareng - Mukus section has the highest priority with a weight of 0.24, followed by the Arjosari - Purwantoro section with a weight of 0.23, and the Bts. Ponorogo Regency - Bts. Pacitan City with a weight of 0.21. In the PRMS analysis, road handling priorities based on TPI (Infrastructure Priority Level) also show similar results, with the Wareng - Mukus section as the highest priority (TPI 33.1), followed by the Bts. Ponorogo Regency - Bts. Pacitan City (TPI 12.2), and the Arjosari - Purwantoro section (TPI 11.2). This research is expected to provide useful recommendations for road management and planning in Pacitan District.
Astasari, A. W., Oetomo, W., & Sajiyo, S. (2024). Sensitivity Analysis of Revenue Potential in The Evaluation of East Surabaya Hospital Investment. International Journal of Social Science and Community Service, 2(4), 255–266.
Boamah, P. A. (2010). Development of models for optimal road maintenance fund allocation: A case of Ghana. University of Birmingham.
Dwiyahreni, A. A., Fuad, H. A. H., Muhtar, S., Soesilo, T. E. B., Margules, C., & Supriatna, J. (2021). Changes in the human footprint in and around Indonesia’s terrestrial national parks between 2012 and 2017. Scientific Reports, 11(1), 1–14. https://doi.org/10.1038/s41598-021-83586-2
Haynes, M. E. (1984). Managing performance: A comprehensive guide to effective supervision. (No Title).
Kusnadi, E., & Warnars, H. L. H. S. (2021). Prediksi Prioritas Infrastruktur Jalan di Provinsi Banten Dengan Metode AHP. JURNAL SISFOTEK GLOBAL, 11(1). https://doi.org/10.38101/sisfotek.v11i1.347
Okate, A., & Kakade, V. (2019). Risk management in road construction projects: High volume roads. Proceedings of Sustainable Infrastructure Development & Management (SIDM).
Prijambodo, M., & Baihaqi, I. (2020). Developing Risk Based Maintenance Strategy Using House Of Risk: A Case Study Of Export Gas Pipeline. INSTITUT TEKNOLOGI SEPULUH NOPEMBER.
Riverson, J., Gaviria, J., & Thriscutt, S. (1991). Rural roads in sub-Saharan Africa. World Bank Technical Paper, 141.
Saaty, T. L. (1980). The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation: McGraw-Hill. New York.
Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1(1), 83–98.