THE LITERATURE REVIEW OF CONSTRUCTION PROJECT SCHEDULING METHODS AND EFFECTIVENESS FOR THE LAST 5 YEARS IN INDONESIA
Main Article Content
Resources in the project were definitely limited so planning must be thorough and perfect. To achieve this goal, developers, contractors, and project owners create a project implementation schedule as well as control the implementation of the project itself. Scheduling determines when activities will be started, postponed and completed, so that resource control will be adjusted to the needed that had been determined. In project planning, scheduling was very important in projecting the needed of manpower, materials, and equipment. This study aims to assess project scheduling in general based on literature sources in the form of previous research (journals). The method used in this study was a literature study related to scheduling studies based on construction projects. Data were obtained from several library sources in the form of research journals for the last 5 years related to the research topic. The results showed that each method was complementary, such as LoB combined with CPM or PDM. In scheduling a construction project, a combination of methods needed to be applied to suit the desired construction project.
Fahrian, F., Haryanto, B., & Jamal, M. (2022). Perbandingan Penjadwalan Proyek Dengan Metode PDM (Precedence Diagram Method) & CPM (Critical Path Method). Teknologi Sipil, 5(2), 17–25.
Husen, A. (2009). “Manajemen Proyek.” CV. Andi Offset.
Kalia, S. M., Utiarahman, A., & Tuloli, M. Y. (2022). Penerapan Metode Line Of Balance Pada Proyek Konstruksi Repetitif (Studi Kasus: Perumahan Griya Tunas Mandiri). Jurnal Penelitian Jalan Dan Jembatan, 2(2).
Prahadita, R. M., Sari, S. N., & Hermawan, A. (2021). Penjadwalan Menggunakan Metode Pert Pada Proyek Peningkatan Jalan Mekar Mukti-Cibarusah, Jawa Barat, Bekasi. Civil Engineering, Environmental, Disaster & Risk Management Symposium (Ceedrims) Proceeding.
Rosanti, N., Setiawan, E., & Ayuningtyas, A. (2016). Penggunaan Metode Jalur Kritis Pada Manajemen Proyek. Jurnal Teknologi, 8(1), 23–30.
Setiawati, S., Syahrizal, & Rezky, A. D. (2017). Penerapan Metode CPM Dan PERT Pada Penjadwalan Proyek Konstruksi (Studi Kasus: Rehabilitasi / Perbaikan Dan Peningkatan Infrastruktur Irigasi Daerah Lintas Kabupaten/Kota D.I Pekan Dolok). Jurnal Teknik Sipil USU, 6(1), 1–14.
Situmorang, P. D. S., Syahrizal, & Jaya, I. (2017). Analisa Penjadwalan Proyek Dengan Time Schedule Kurva S, Precedence Diagram Method (PDM), Dan Ranked Positional Weight Method (RPWM) (Studi Kasus: Proyek Pembangunan Museum Deli Serdang - Lubuk Pakam). Jurnal Teknik Sipil Universitas Sumatera Utara, 3(7), 93–112.
Soleha, R., & Ismail, A. (2018). Analisa Efektivitas Waktu dan Biaya Proyek Ditinjau Dari Unsur–Unsur Manajemen Proyek (Studi Kasus Overlay Runway Bandara Innternasional Soekarno-Hatta). Jurnal Konstruksi, 16(2), 23–31.
Soplanit, N., Maelissa, N., & Titaley, H. D. (2021). Analisis Penerapan Metode Line Of Balance Pada Pembangunan Rumah Susun Pemkab Kepulauan Tanimbar. Jurnal Simetrik, 11(2), 474–479.
Yusdiana, E. D., & Satyawisudarini, I. (2018). Penerapan Metode Pert Dan Cpm Dalam Pelaksanaan Proyek Pembangunan Jalan Paving Untuk Mencapai Efektivitas Waktu Penyelesaian Proyek. JURNAL MANAJEMEN DAN BISNIS (ALMANA), 2(3), 20–30.