THE CONTRACTOR SELECTION CRITERIA AFFECTING PROJECT PERFORMANCE CONSTRUCTION SEBA PIER PORT FACILITIES, SABU RAIJUA, NTT
Main Article Content
The selection of contractors will affect the performance of the project to be implemented. The criteria for selecting a contractor consist of 3 factors, namely Factor 1 which includes accuracy, reputation, and cooperation relationships, Factor 2 which includes knowledge of work, work ability, initiative, and social ability as well as Factor 3 which includes work experience, control, and commitment. This study aims to analyze the criteria for selecting contractors that affect the performance of construction projects. This research was conducted using quantitative methods by conducting field surveys or field studies. The sample population in this study was Seba Pier Port Facilities Project, Sabu Raijua, NTT Owner as many as 57 people. The analysis technique in this study was Multiple Linear Regression Analysis. The results of the research and discussion can be concluded that The criteria for selecting a contractor that affects the performance of a construction project are price, financial capability, equipment support, and contractor performance. Meanwhile, the criteria for experience and occupational safety and health (K3) do not affect the performance of construction projects. Meanwhile, if the contractor had the appropriate benchmark price, financial capability, equipment support, and performance of the contractor, then the performance of the construction project will certainly be good.
Annur, C. M. (2022). Terus Meningkat, Jumlah Penduduk RI Tembus 275, 77 Juta hingga Pertengahan 2022 x Diakses pada 20 Oktober 2022.
Chandra, H. P. (2013). Prakualifikasi Dan Evaluasi Penawaran Dalam Pemilihan Kontraktor Terhadap Kinerja Proyek. Unpar Bandung.
Ervianto, W. I. (2002). Teori Aplikasi Manajemen Proyek Konstruksi. ANDI.
Ervianto, W. I. (2009). Manajemen Proyek Konstruksi. Graha Ilmu.
Harianto, R., & Budi, S. (2021). Pemilihan Kontraktor Spesialis Oleh Kontraktor Utama Dengan Metode Analytical Hierarchy Process. Konstruksia, 12(1), 45. https://doi.org/10.24853/jk.12.1.45-52
Ihwanudin, M. N. (2017). Analisa Penjadwalan Proyek Pipa Carbon Dengan Metode Fuzzy Logic Application For Scheduling. Universitas Muhammadiyah Gresik.
Jean Cross Sihombing, D. (2016). Analisis Pemilihan Proyek Pada Asosiasi Kontraktor Menggunakan Fuzzy Ahp Dan Fuzzy Topsis. UAJY.
KEMENPUPR. (2020). Kunci Keberhasilan Pembangunan Infrastruktur, Pelaku Konstruksi Harus Samakan Pemahaman Terhadap Kontrak Konstruksi.
Lela, J. C., Manoppo, F. J., & Supit, C. J. (2022). Analisis Penyebab Dan Pengaruh Contract Change Order Terhadap Kinerja Kontraktor Pada Proyek Konstruksi Di Kabupaten Minahasa Selatan. JURNAL ILMIAH MEDIA ENGINEERING, 12(1).
Ruci, M., & Kristiana, W. (2019). Pandangan Pemilik Proyek Terhadap Kinerja Kontraktor Pada Pekerjaan Konstruksi Di Kabupaten Barito Timur. Jurnal Teknika: Jurnal Teoritis Dan Terapan Bidang Keteknikan, 3(1), 53–63.
Sattung, T., Haerani, S., & Hakim, W. (2019). Faktor-Faktor Kriteria Pemilihan Kontraktor Yang Contractor Selection Criteria Affecting Project. Hasanuddin Journal of Applied Business and Entrepreneurship, 39–48.
Stefany, O. (2015). Analisis Faktor Yang Mendukung Kesuksesan Proyek Gedung Bagi Kontraktor Di Kota Yogyakarta. UAJY.