PROJECT SCHEDULING ANALYSIS USING THE CRITICAL PATH METHOD – CASE STUDY: SUBSIDIZED HOUSE CONSTRUCTION PROJECT IN HILL MULYA HOUSING, SAMARINDA CITY
Main Article Content
Samarinda City has a total of 123 housing estates with 20 subsidized housing (MBR) and 4 mixed housing. Project scheduling in construction greatly determines the project's success because it is a benchmark that the project is successful within the allotted time. CPM (Critical Path Method). CPM is a method that introduces an element of project time by using a predefined activity time estimate. This method is used for crushing the Bukit Mulya housing project, which only applies to the implementation of crash time. From the analysis results, the initial scheduling time, which was originally 87 days, was trimmed by 9 days using CPM, the optimal time was 78 days.
A, A.H. (2005). Project Planning and Control with Pert Method - CPM Case Study: Ahmad Yani Fly Over – Karawang. Winner, 6(2), 155. https://doi.org/10.21512/tw.v6i2.605
Astuti, P.K., & Asnawi. (2014). Housing Development Planning for Low-Income Communities in Banyumanik District. PWK Engineering, 3(4), 895–907.
Beatrix, M., Lukmansyah, I., Ezra, O., Muin, A., Critical, P., Sipil, J.T., Sipil, J.T., Sipil, J.T., & Critical, J. (2019). Faculty of Engineering, Sumenep Wiraraja University - Madura. 7(2), 17–22.
Hidayatul, F., Wahyono, H., Gusminto, E.B., & Kalimantan, J. (2018). Evaluation of Time Schedule for the Type 30 House Construction Project at the Tegal Besar Palace, Jember Regency Using the CPM Method (Evaluation of the Time Schedule for the Type 30 House Construction Project at the Tegal Besar Palace, Jember Using the CPM Method). L Business Economics and Accounting, V(7), 153–157.
Ii, T., & Samarinda, D.I.S. (2022). Optimization Of Scheduling Time Using The Evaluation And Review Technique (Pert) Program For Type 36 House Construction At Pt. Arisko. 1–8.
Jufriyanto, M., & Zainuddin, M. (2019). Management of the Rungkut Tower Apartment Development Project with the Critical Path Method and Pert Approach. 03(02).
T., Dan, S., & Currie, A. (2019). Use of the critical path method ( CPM ) to evaluate the time and cost of project implementation. 15(2), 102–111.
Case, S., Rumah, P., Amahusu, D., & Ambon, K. (2018). Time Scheduling Of Housing Development Project Using Cpm (Critical Path Method) Time Schedule Project Of Housing Development Using Cpm (Critical Path Method) (Case Study: Residential Development in Amahusu Village, Ambon City). 12, 61–68.
Mahapatni, I. A. P. S. (2019). Construction Project Planning and Control Methods. In UNHI Press.
Maprilana, H. (2019). Scheduling Project Analysis Using Cpm Method (Case study: Project of the Surabaya Caspian Tower Apartment). 02(01), 26–39.
Nahdlatul, U., Purwokerto, U., & Selatan, P. (2021). Project Planning And Control Using The Cpm (Critical Path Method) At Pt Ghani Sejahtera Abadi Project Planning And Control Using The Cpm (Critical Path Method)
Perdana, M. S. A., & Sari, R. P. (2022). Optimizing the Implementation Time of Residential Construction Projects Using the CPM ( Critical Path Method ) and PERT ( Program Evaluation and Review Technique ) Optimizing the Implementation Time of Residential Construction Projects Using the CPM ( Cri. 6(2), 116–123. https:/ /doi.org/10.35194/jmtsi.v6i2.1944
Pratasik, F. (2013). Analyzing the Sensitivity of Project Duration Delays Using the Cpm Method (Case Study: Puri Kelapa Gading Housing). Faculty of Engineering, Department of Civil Engineering, University of Sam Ratulangi Manado, 1(9), 603–607.
Rani, H. A. (2016). Construction Project Management. 99. https://www.researchgate.net/publication/316081639_Manajemen_Proyek_Konstruksi
Sa, N., & Rijanto, T. (2021). Evaluation of the Stroke Center Building Construction Project (Flamboyan Pavilion) Using the Critical Path Method (CPM) and Crashing Evaluation of building construction Stroke Center (Flamboyant Pavilion) using the Critical Path Method (CPM) And Crashi. 3(2).
Sejahtera, P. D. I. (2013). Design Concept. In Journal of Chemical Information and Modeling (Vol. 53, Issue 9).
Suharto. (1999). Project Management (Vol. 60, Issue 5). https://doi.org/10.3938/jkps.60.674
Telaumbanua, T. A., Engineering, F., Civil, J. T., & Ratulangi, U. S. (2017). Manado Modisland With Cpm Method. 5(8), 549–557.
Thoengsal, J. (2022). Construction Project Implementation Scheduling Optimization Method Using the Critical Path Method (CPM) (Issue July).
Tjakra, J., & Pratasis, P. A. K. (2016). Application Of The Cpm Method To Construction Projects (Case Study Of The New Building Of The Eben Haezar Manado Complex). 4(9), 551–558.