COST PERFORMANCE ANALYSIS USING EARNED VALUE METHOD ON PRESERVATION OF EXIT TOLL ROAD SECTION 5 PANDAAN MALANG
Main Article Content
The development of road or toll road infrastructure in a country can be used as a benchmark to determine the level of economic progress of a country, both macro and micro. The location of toll exits has a significant effect in absorbing labor and creating new business activities. Projects are dynamic, so contractors must be responsive to changes in situations and conditions on the project, if they want to succeed in reaping optimum profits. Aspects of planning a highly competitive construction at this time are very demanding on accuracy, effectiveness, efficiency, and economy in analyzing a project. In the world of construction projects, there are many things that can be done, one of which is cost control. In controlling costs, efforts can be made so that the realization of costs that occur is in accordance with the needs of implementation and is not excessive, such as cost suppression efforts, namely making savings without reducing quantity or quality. The Earned Value Method is used to determine project performance in terms of costs at one time, determine project performance in terms of schedule/time at one time, estimate costs to complete the project after the evaluation time and estimate the time to complete the project after the evaluation. In this research the author carried out a cost analysis using the Earned Value Method on the preservation of the Section 5 Pandaan Malang Toll Exit Road.
AACE® International Recommended Practice. (n.d.). Cost Engineering Terminology. Retrieved November 15, 2023, from https://library.aacei.org/terminology/welcome.shtml
Abd. Rahman Rasidin, Muh. Nashir T., & Hendro Widarto. (2022). Studi Kelayakan Pembangunan Jalan Lingkar Tengah Kota Parepare. Jurnal Karajata Engineering, 2(1), 19–25. https://doi.org/10.31850/karajata.v2i1.1632
Akbar, R. W., & Maliki, I. (2018). Pembangunan Sistem Informasi Manajemen Sumber Daya Manusia Di Pt. Saekan Bumi Persada. 1–10. https://elibrary.unikom.ac.id/id/eprint/414/
Alfadin, M. R., & Witjaksana, B. (2023). Analisis Biaya dan Waktu dengan Metode Nilai Hasil (Studi Kasus : Preservasi Jembatan Sembayat Di Gresik). Ensiklopedia Of Journal, 5(4). https://doi.org/https://doi.org/10.33559/eoj.v5i4.1741
Arifin, Z. (2017). Modul 01 Pengantar Manajemen Proyek (Vol. 01). https://pustaka.ut.ac.id/lib/wp-content/uploads/pdfmk/MSIM4406-M1.pdf
Arsjad, T. T., & Malingkas, Y. G. (2020). Pengendalian Biaya Dan Waktu Pada Proyek Pembangunan Ruko Di Area Perumahan Kharisma Koka Minahasa Menggunakan Metode Konsep Nilai Hasil. Jurnal Sipil Statik, 8(1), 53–64.
Balai Besar Pelaksanaan Jalan Nasional (BBPJN) Jawa Timur. (2022). Dokumen Suplemen Dokumen Evaluasi Lingkungan Hidup ( DELH ) Pembangunan / Peningkatan Jalan Jawa Timur – 2 Exit Toll Seksi 5 Pandaan – Malang (Issue November). https://p3tb.com/uploads_file/20230216.3661.Supplement_DELH_Preservasi_Jalan_pada_Exit_Tol_Pandaan_Malang_P3TB.pdf
Fauzy, Y., Mochtar, B., & Marzuki, R. (2020). Analisa Biaya Dan Waktu Dengan Metode ( Earned Value Analysis ) Pada Lanjutan Peningkatan Jalan Awang Long – Jalan Darmawan Desa Kota Bangun Ilir Kecamatan Kota Bangun. Kurva S Jurnal Keilmuan Dan Aplikasi Teknik Sipil, 11(1), 1–13. http://ejurnal.untag-smd.ac.id/index.php/TEK/article/view/5238/4984
Fleming, Q. W., & Koppelman, J. M. (1994). The Essence of Evolution of Earned Value.
Peraturan Gubernur Jawa Timur Nomor 33 Tahun 2022 Tentang Harga Satuan Pokok Kegiatan Pemerintah Provinsi Jawa Timur, 1 (2023). https://peraturan.bpk.go.id/Download/222949/2022PERGUBJATIM033.pdf
Peraturan Gubernur Jawa Timur Tentang Standar Satuan Harga Barang Pemerintah Provinsi Jatim Tahun 2022, Pub. L. No. 30/2022, 31 (2023). https://peraturan.bpk.go.id/Download/222888/2022PERGUBJATIM030.pdf
Hansen, S. (2015). Manajemen Kontrak Konstruksi (1st ed.). PT. Gramedia Pustaka Utama. https://scholar.google.co.id/scholar?oi=bibs&cluster=16577217016900568223&btnI=1&hl=en
Harefa, M. B., & Surbakti, A. A. (2021). Pengendalian Pelaksanaan Pada Proyek Jalan Dengan Earned Value Analysis. Juitech, 5(2), 14–22. http://www.portaluniversitasquality.ac.id:5388/Ojssystem/index.php/JUITECH/article/download/627/pdf
Herman, F., & Saleh, S. M. (2011). Biaya Preservasi Jalan Akibat Truk Dengan Beban Berlebih di Jalan Pesisir Timur Provinsi Aceh. Jurnal Transportasi, 11(3), 219–228. https://journal.unpar.ac.id/index.php/journaltransportasi/article/view/460/444
Maulidi, N., Huda, M., & Tjendani, H. T. (2021). Analisis Biaya dan Waktu Pada Pembangunan Gedung Trauma Center Dan Intensive Care Tahap IV RSUD Dr. Soedono Madiun dengan Metode Earned Value. Jurnal Spesialis Teknik Sipil, 2(2). https://jurnal.untag-sby.ac.id/index.php/JSpTS/article/view/7088/5004
Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum dan Perumahan Rakyat Tahun 2022, Pub. L. No. 01/2022, Kementrian PUPR 1 (2022). https://jdih.pu.go.id/internal/assets/assets/produk/PermenPUPR/2022/01/PermenPUPR1.zip
Nastiti, H., Suryana, D. S., Aulia, F. R. F., & Ramsyahdira, M. R. (2023). Control Analysis of the Griya Jenggala Development Project using the Earned Value Method at PT Sarana Loka Almika in Kebayoran. Journal of Innovation and Community Engagement, 4(3), 174–191. https://doi.org/10.28932/ice.v4i3.7346
Nufah, Y. W., Yanti, G., & Lubis, F. (2019). Analisis Proyek Dengan Metode Earned Value Concept (Studi Kasus Pada Proyek Pembangunan Jalan Tol Ruas Pekanbaru – Dumai Seksi 2 Sta. 9+500 – 33+600). Prosiding Seminar Nasional Cendekiawan, 5, 1.59.1-1.59.7. https://trijurnal.lemlit.trisakti.ac.id/index.php/semnas/article/view/5740
Peraturan Walikota Malang nomor 10, Pub. L. No. 10/2022, Harga Satuan Pekerjaan Konstruksi 1 (2022). https://peraturan.bpk.go.id/Download/221352/Salinan Perwal No 10 Tahun 2022 Ttg Harga Satuan Pekerjaan Konstruksi.pdf
Peraturan Menteri Pekerjaan Umum Republik Indonesia Nomor 13/PRT/M/2011 Tentang Tata Cara Pemeliharaan Dan Penilikan Jalan, Menteri Pekerjaan Umum Republik Indonesia 1 (2011). https://peraturan.bpk.go.id/Download/136608/PermenPU13-2011.pdf
PPK 3.6 SATKER PJN WIL III Provinsi Jawa Timur BBPJN JATIM BALI. (2023). Uraian Singkat Preservasi Jalan Pada Exit Tol Seksi 5 Pandaan Malang. 3–5. https://lpse.pu.go.id/eproc4/dl/b070fae498f37e56181275810d2b0d2b360631800f75dfeace99b3f9729040e323518417a8f8bc12284b9507a8e0133c957265cb391927718ca34459e5ee45b3f4552532dde04724189ccb8bc67ec0304ceea7a78e683f47b2cff8ca7d4e557569da8d910c60f0201d7d48c2027d066
Pratama, F., Waluyo, R., & Puspasari, V. H. (2019). Analisis Kinerja Proyek Peningkatan Jalan Pelantaran-Parenggean-Tumbang Sangai Dengan Metode Earned Value. Oktober, 3(1), 1–10. https://e-journal.upr.ac.id/index.php/JT/article/view/1325/1109
Proaño-Narváez, M., Flores-Vázquez, C., Vásquez Quiroz, P., & Avila-Calle, M. (2022). Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections. Buildings, 12(3), 301. https://doi.org/10.3390/buildings12030301
Project Management Institute. (2017). A Guide to The Project Management Body of Knowledge. In Inc. The Project Management Institute (Ed.), Project Management Institute, Inc. (6th ed., Vol. 2, Issue 1). Project Management Institute.
Ridha, R., Syarwan, & Supardin. (2020). Analisis Waktu dan Biaya Proyek Peningkatan Jalan Tgk. Muda Lamukta Lhokseumawe dengan Metode Earned Value. Jurnal Sipil Sains Terapan, 03(2), 1–75. https://e-jurnal.pnl.ac.id/JSST/article/view/3105/2565
Ritz, G. J. (1994). Total Construction Project Management (Vol. 2013).
Surat Edaran Nomor 09/SE/Db/2021 tentang Perencanaan dan Pemrograman Pekerjaan Preservasi Jaringan Jalan (Bagian Dari Manajemen Aset Prasarana Jalan), Surat Edaran Dirjen Bina Marga 2021 1 (2021). https://binamarga.pu.go.id/index.php/peraturan/dokumen/surat-edaran-nomor-09sedb2021-tentang-perencanaan-dan-pemrograman-pekerjaan-preservasi-jaringan-jalan-bagian-dari-manajemen-aset-prasarana-jalan
Sidiq, A. P., & Johari, G. J. (2022). Analisis Penerapan Earned Value Terhadap Manajemen Waktu dan Biaya pada Proyek Jembatan Cibuni. Jurnal Konstruksi, 20(1), 139–150. https://doi.org/10.33364/konstruksi/v.20-1.1036
Soeharto, I. (1999). Manajemen Proyek (Dari Konseptual Sampai Operasional). In Penerbit Erlangga (2nd ed., Vol. 1). Penerbit Erlangga.
Soemardi, B. W., Wirahadikusumah, R. D., Abduh, M., & Pujoartanto, N. (2006). Konsep Earned Value untuk Pengelolaan Proyek Konstruksi. Institut Teknologi Bandung, 1–13. https://www.academia.edu/2979947/Konsep_Earned_Value_untuk_Pengelolaan_Proyek_Konstruksi
Sugiyanto, S., & Kosbiamtoro, A. (2022). Analisis Kinerja Biaya Pada Proyek Rehabilitasi Drainase Dan Trotoar Jalan Teuku Umar Paket I Dengan Metode Earned Value. Jurnal Litbang Sukowati : Media Penelitian Dan Pengembangan, 5(2), 126–141. https://doi.org/10.32630/sukowati.v5i2.320
Susanti, B., Melisah, M., & Juliantina, I. (2019). Penerapan Konsep Earned Value Pada Proyek Konstruksi Jalan Tol (Studi Kasus Ruas Jalan Tol Kayuagung - Palembang -Betung). Jurnal Rekayasa Sipil (JRS-Unand), 15(1), 12. https://doi.org/10.25077/jrs.15.1.12-20.2019
Tangtobing, R. F. F., & Waty, M. (2023). Penerapan Metode Earned Value Dan Earned Schedule Pelaksanaan Proyek Rumah Sakit X Di Bandung. JMTS: Jurnal Mitra Teknik Sipil, 6(2), 237–248. https://doi.org/10.24912/jmts.v6i2.22251
Tenggara, M. A. P., Agustin, I. W., & Hariyani, S. (2021). Kinerja Jalan Di Kota Surabaya Berdasarkan Tingkat Pelayanan Jalan. Planning for Urban Region and Environment, 10(3), 119–128. https://purejournal.ub.ac.id/index.php/pure/article/view/194/149
Widiasanti, I., & Lenggogeni. (2013). Manajemen Konstruksi. In P. Latifah (Ed.), Remaja Rosdakarya. PT Remaja Rosdakarya.
Zakariyya, B., Ridwan, A., & Suwarno, S. (2020). Analisis Biaya Dan Jadwal Proyek Pembangunan Gedung Dinas Kesehatan Kabupaten Trenggalek Dengan Metode Earned Value. Jurnal Manajemen Teknologi & Teknik Sipil, 3(2), 362. https://doi.org/10.30737/jurmateks.v3i2.1197
Zanuardi, A., & Suprayitno, H. (2018). Analisa Karakteristik Kecelakaan Lalu Lintas di Jalan Ahmad Yani Surabaya melalui Pendekatan Knowledge Discovery in Database. Jurnal Manejemen Aset Infrastruktur & Fasilitas, 2(1), 45–55. https://doi.org/10.12962/j26151847.v2i1.3767