DESIGN REVIEW ANALYSIS OF THE USE OF STONE HEAPS FROM STONE EXCAVATIONS IN THE PROBOLINGGO – BANYUWANGI TOLL ROAD CONSTRUCTION PROJECT SECTION 3
Main Article Content
In constructing a toll road, the road structure will be carried out by constructing embankments on the road. However, in practice it often causes elevation differences between the two land surfaces, thereby increasing the risk of landslides. The objectives of the research are 1) Identifying the impact if Common Borrow Material (CBM) embankment work is replaced by rock embankment from excavation results, 2) Determine the value engineering process steps related to completing alternative design selection if there are differences between the actual Detailed Engineering Design in the field and 3) Determine the strategy and design optimization for volume differences which have implications for additional costs and project implementation time. The research uses a combination of quantitative and qualitative research methods. The data analysis technique is carried out using the Zero-one and Cost Analysis methods. The research results prove that 1) Implementation of the design review method for changes in common borrow material dumping work requires innovation to reduce cost elements and match performance and quality. 2) Solving problems using the design review method in the civil works construction phase where the Detail Engineering Design and actual field conditions have different stages of value engineering analysis. 3) Based on function analysis to optimize cost savings for work items using design review, a Preliminary Design according to DED Rp. 4,068,258,782,670 and Design after RE Rp. IDR 3,987,286,153,268 so the cost reduction after implementing the design review for the work of piling stones from stone excavation results is IDR 80,972,629,402.
Ahmed, K. A. A., & Pandey, R. K. (2016). Concept of value engineering in construction industry. International Journal of Science and Research, 5(4), 1231–1237.
Asiyanto. (2002). Construction Project Cost Management. Pradnya Paramita Publisher.
Asiyanto, W., & IPM, M. (2005). Construction Project Cost Management. Jakarta: Pradyna Paramita.
Atabay, S., & Galipogullari, N. (2013). Application of value engineering in construction projects. Dec.
BAPPENAS-BAKORNAS. (n.d.). National Action Plan for Disaster Risk Reduction 2006-2009. Collaboration between the National Development Planning Agency and the National Disaster Management Coordinating Agency. Republic of Indonesia State Printing Company.
Berawi, M., Priyatno, H., Latief, Y., & Rahman, H. (2011). Application of value engineering at design stage in Indonesia construction industry. Proc., 12th Int. Conf. on QIR (Quality in Research), 2121–2126.
Bowles. (1991). Foundation Analysis and Design IV Edition. Volume I. Translation. (IV). Erlangga Publishing PT. Jakarta.
Cesaria, D. (2013). Application of Value Engineering (Value Engineering) in the Building II Building Project. Brawijaya University, Surabaya University.
Chandra, S. (1987). Application of Value Engineering & Analysis in Planning and Implementation to Achieve Efficiency Programs. Diponegoro University, Semarang.
Hidayat, A. N., & Ardianto, D. (2011). Rekayasa Nilai Pembangunan Gedung Rusunawa Amabarawa (Value Engineering Construction of Ambarawa’s RUSUNAWA Building). F. Teknik Undip.
Listiono, A. (2011). Application of Value Engineering to Plate and Beam Structures in the MTA Gemolong Middle School Boys’ Dormitory Building Construction Project. Faculty of Civil Engineering, Sebelas Maret University, Surakarta.
Mitchell, R., & Chandra, S. (1987). Value Engineering. Bandung.
Rompas. (2013). Application of Value Engineering in the Manado Orlens Fashion Shophouse Construction Project. Sam Ratulangi University.
Sekarti, D. N. A. (2018). Analisis stabilitas timbunan di jalan tol semarang-solo ruas salatiga-kartasura (Analysis of embankment stability on semarang-solo road segment salatiga-kartasura).
Send Pristianti Day. (2012). Application of Value Engineering in the Construction of the Gambiran Hospital Building Phase II, Institute of Technology November 10.
Thoengsal, J. (2014). Factors that cause construction material waste. Thursday, March 7 2019 at 22.30. https://jamesthoengsal.blogspot.com/p/Blogpage- _20.Html.
Ustoyo, D. A. (2007). Application of Value Engineering to Plate and Foundation Elements in the Semarang Muhammadiyah University Rectorate Building Construction Project. Faculty of Civil Engineering, Semarang State University.
Witjaksana. (n.d.). Cost and Time Analysis of the Graha Mojokerto Service City (Gmsc) Building Construction Project Due to Design Changes. University 17 August 1945. Surabaya.