THE ANALYSIS OF CONTRACTOR SELECTION PRIORITY DETERMINATION FOR THE LONG SEMAMU – LONG BAWAN 2 ROAD CONTRUCTION PROJECT, NORTH KALIMANTAN
Main Article Content
Road construction is one of the fulfillment of the government's duties in providing mobility facilities for people's land transportation to move from one place to another. The government, through contractors as road construction implementers, must work carefully, so it is important for the government to select road construction contractors who meet predetermined criteria so that the road construction process can take place optimally. This study aims to find priority criteria and alternative contractors in the process of selecting Long Semamu – Long Bawan Road Construction Contractors. This study uses a quantitative descriptive approach with the aim of determining the Criteria and Alternative Variables. The population of this study were employees of the Public Works Department as the Tender Team for the Selection of Road Construction Contractors as many as 32 people with the research sample being the total population. Data collection techniques were carried out by distributing questionnaires and interviews. Data analysis techniques for research aids use the AHP method with AHP data processing software (Expert Choice version 11). The results of the study prove that the Price Criteria is a priority criterion in the selection of road construction contractors. In addition, Contractor C is an alternative priority in road construction.
Andani, R. S. H. D. (2017). Penjadwalan Proyek dengan Limited Resource Menggunakan Resources Over Time (ROT) Algorithm (Studi Kasus : PT. Geluran Adikarya). Universitas Muhammadiyah Malang.
Brahmantoro, W., Sutanto, H., & Nusa, S. (2019). Roads Widening Selection In Tulungagung: Application Of AHP. International Journal of Scientific & Technology Research, 8(10).
Chandra, H. P. (2013). Prakualifikasi Dan Evaluasi Penawaran Dalam Pemilihan Kontraktor Terhadap Kinerja Proyek. Unpar Bandung.
Ervianto, I. W. (2005). Manajemen Proyek Konstruksi (Revisi). ANDI.
Faizal, N., & Suprayoga, G. B. (2014). Sistem Pengadaan Untuk Pembangunan Jalan. In Academia.Edu. Pulitbang Jalan dan Jembatan.
Harianto, R., & Budi, S. (2021). Pemilihan Kontraktor Spesialis Oleh Kontraktor Utama Dengan Metode Analytical Hierarchy Process. Konstruksia, 12(1), 45. https://doi.org/10.24853/jk.12.1.45-52
Lubis, K., & Mulyono, A. . (2015). Identifikasi Kinerja Konsultan Supervisi Proyek Penanganan Jalan Nasional (Studi Kasus: BBPJN-I Di Provinsi Sumatera Utara). Universitas Gadjah Mada.
Ministry of Public Works and Public Housing. (2020). Kunci Keberhasilan Pembangunan Infrastruktur, Pelaku Konstruksi Harus Samakan Pemahaman Terhadap Kontrak Konstruksi.
Mulyono, A. T. (2013). Monitoring dan Evaluasi Indikator Penyedia dan Pengguna Jasa terhadap Kegiatan Penanganan Jalan Nasional di Ditbinlak Wilayah-1. Kementerian Pekerjaan Umum Ditjen Bina Marga.
Saaty, T. L. (1993). Pengambilan Keputusan (2nd ed.). PT. Pustaka Binaman Presindo.
Sandika, P., & Rurry, P. (2019). Analisis Pemilihan Kontraktor Menggunakan Metode Analytical Hierarchy Process (AHP) (Studi Kasus Pembangunan Jembatan di Desa Karangan). Integrasi : Jurnal Ilmiah Teknik Industri, 4(1), 1. https://doi.org/10.32502/js.v4i1.2092
Sinaga, A. (2019). Flexible Pavement Planning Using the Bina Marga Method on Jalan Sisingamangaraja. Universitas HKBP Nommensen.
Suryadi, A., & Nurdiana, D. (2015). Sistem Pengambilan Keputusan Untuk Pemilihan Teknisi Lab Dengan Multi Kriteria Menggunakan Metode AHP (Analytic Hierarchy Process). Jurnal Pendidikan Matematika, 5(1), 11–21.