TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD WITH ADDITIONAL WORKING HOURS IN THE CONSTRUCTION PROJECT OF KAPAS – GLENDENG 8 BRIDGE, BOJONEGORO DISTRICT
Main Article Content
Infrastructure development plays a very important role as capital in efforts to stimulate increased economic productivity, both at the national and regional levels, as well as reducing unemployment, alleviating people from poverty and of course improving the standard of living of the community at large. Delays in completing a project are a problem that often arises and can have an impact on the entire work, especially with time delays resulting in increased costs which can be detrimental to many parties. This delay also occurred in the Kapas-Glendeng 8 bridge construction project, Bojonegoro Regency. In anticipation of these delays, it is necessary to accelerate time and costs. In this research the author uses the crashing method with the alternative of increasing working hours. The crashing method is a way of estimating cost variables to determine the maximum and most economical reduction in the duration of an activity that is still possible to reduce. The research results showed that the total time and cost of the project required after crashing was 174 calendar days with a cost under accelerated conditions of Rp. 2,555,189,555.98 with a difference of 6 calendar days from the normal duration of 180 calendar days and a fee under normal conditions of Rp. 2,548,581,990.63.
Budianto, E. A., & Husin, A. E. (2021). Analisis Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off Pada Proyek Gudang Amunisi. Jurnal Aplikasi Teknik Sipil, 19(3), 305–310.
Irawan, Y. A., & Juara, A. (2022). Analisa Optimasi Biaya Dan Waktu Metode TCTO (Time Cost Trade Off)(Study Kasus: Preservasi Jalan Ruas Sp. Gunung Kemala–Sanggi). Jurnal Civil Engineering Study, 2(02), 60–66.
Kementerian Pekerjaan Umum [PU]. (2016). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 28. PRT/M/2016 Tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan ….
Muhyi, A. (2018). Percepatan Proyek Menggunakan Metode Time Cost Trade Off Pada Proyek Jembatan Krueng Tingkeum Kabupaten Bireuen. Prosiding Seminar Nasional Politeknik Negeri Lhokseumawe, 2(1).
Rosyid, R., Sarya, G., Beatrix, M., & Oetomo, W. (2020). Studi Analisis Biaya Dan Waktu Menggunakan Metode Time Cost Trade Off (Tcto) Pada Proyek Telkom Manyar-Surabaya. Extrapolasi, 17(1), 20–29.
Wardana, Z. R., & Putra, I. N. D. P. (2023). Analisis Percepatan Proyek Menggunakan Metode Fast Track DAN Metode Crashing Pada Proyek Pembangunan Gedung Bertingkat. Cived, 10(2), 491–500.
Wijanarko, B., & Oetomo, W. (2019). Analisis Percepatan Waktu Penyelesaian Proyek Dengan Metode Crashing Dan Fast Tracking Pada Pelebaran Jalan Dan Jembatan’. Jurnal Untag__.
Yaqin, H. N., Tjendani, H. T., & Witjaksana, B. (2023). Analysis of The Acceleration of Time and Cost of Implementing Building Construction Projects Using The Critical Path Method (CPM) Method. Devotion Journal of Community Service, 4(2), 336–346.
Zuhriyah, A., & Oetomo, W. (2022). Analisis Percepatan Waktu Dengan Metode Fast Track Dan Crashing Pada Proyek Pt Graynenda Putra Karya. Jurnal Kacapuri: Jurnal Keilmuan Teknik Sipil, 5(1), 341–350.