EVALUATION OF COST PERFORMANCE IN THE SUTOJAYAN DISTRICT SUBALI BRIDGE CONSTRUCTION PROJECT (D.G.008), BLITAR REGENCY USING EARNED VALUE ANALYSIS METHOD
Main Article Content
One of the project types is the Construction Project. The main activity components of this type of project consist of feasibility assessment, engineering design, procurement and construction. In construction projects very often delays occur where the realization in the field does not match the schedule of the implementation plan, due to several factors that occur, even though a careful plan has been prepared but in practice in the field there are still many problems in implementation. The purpose of this study was to determine the cost and time performance in the implementation that took place from week -1 to week 17 on the Subali Bridge Construction project, Sutojayan Kec. (D.G.008), Blitar Regency using Earned Value. From the results of the analysis it can be seen that the costs incurred are lower than the planned costs, this can be seen in the CPI value of 1.28 while the implementation time is slower than the planned schedule indicated by the SPI value of 0.71. The results of the calculation of the estimated project cost of Rp. 8,214,904,015.36 with a budget plan of Rp. 10,502,000,000.00 there is an efficiency of Rp. 2,287,095.64 (21.78%). with an estimated completion time of 19.43 weeks, indicating that the project is delayed for 2.43 weeks from the planned 17 weeks.
Wardah B, Iskandar BP, Ashad Hanafi. 2017. Analisis Keterlambatan Proyek Jalan Usilimo - Karubaga- Mulia Ii Kab.Puncak Jaya Provinsi Papua. Jurnal Ilmiah Teknik Sipil Vol. 1 Issue 1 November 2017
Dinariana Dwi, Ariane Fatricia. 2018. Earned Value Analysis Pada Pengendalian Waktu Proyek Venue Layar Di Dki Jakarta. Jurnal IKRA-ITH Teknologi Vol 2 No 3 November 2018 ISSN 2580-4308
Juliantina Ika, Melisah, Susanti Betty. 2019. Penerapan Konsep Earned Value Pada Proyek Konstruksi Jalan Tol (Studi Kasus Ruas Jalan Tol Kayuangung palembang -Betung. Jurnal Rekayasa Sipil (Jrs-Unand) Vol. 15 No. 1, Mei 2019.
Pranata Asnur Andi M. H. 2020. Analisis Kinerja Biaya Dan Waktu Dengan Menggunakan Metode Earned Value. UG Jurnal Vol.14 Edisi 09 September 2020.
Junaidi; et al. 2022. Kajian Evaluasi Biaya Dan Waktu Dalam Penanganan Keterlambatan Proyek Menggunakan Metode Earned Value Analysis (Studi Kasus: Proyek Pembangunan Jalan Layang Akses Bandara Jenderal Ahmad Yani Semarang). Bangun Rekaprima Vol. 08/1/April/2022.
Sakinah Nur Karimah. 2021. Analisis Kinerja Biaya Dan Waktu Menggunakan Metode Earned Value Dan Earned Schedule Pada Proyek Pembangunan Villa Pasir Angin Puncak-Bogor. Jurnal Ilmiah Teknik Sipil Volume 3, No. 1, Agustus 2021.
Bakhtiar Amin; et al .2019. Evaluation Of Cost And Time Control In Lhokseumawe City Improvement Project Using Earned Value Method (Case Study Street Alue Raya-Line Pipa). IOP Conf. Series: Materials Science and Engineering 536 (2019) 012105
Tumpu Miswar, Thoengsal James. 2022. Analysis of Project Cost and Time Performance Control Using Earned Value Method Analysis (EVM-A) (Case Study of Concrete Road Construction Project). International Journal of Engineering Bussines and Social Science Vol. 01 No. 02, December 2022, pages: 74-77.