COST AND TIME ANALYSIS USING THE EARNED VALUE METHOD IN THE CONSTRUCTION PROJECT OF THE BPBD BUILDING COMPLEX IN PASURUAN DISTRICT
Main Article Content
In the construction project of the Pasuruan Regency BPBD building complex which is currently still running, there have been problems related to the schedule for the implementation of its activities. The problem in question is the delay in the schedule for the implementation of its activities. where the results of the progress realization are not in accordance with the schedule plan, through this paper an evaluation is carried out related to performance in the field through an approach using the Earned Value Method. The data analysis process is carried out by calculating analysis indicators including BCWS, BCWP and ACWP. The results of the performance evaluation of the Pasuruan Regency BPBD building complex construction project using the Earned Value method show that the project has a negative deviation in the activity implementation schedule. The cost performance indicator on this project shows a Cost Performance Index (CPI) value of 1.137, which means that the costs incurred are greater than planned. While the time performance indicator shows a Schedule Performance Index (SPI) value of 0.949, which means the project is delayed from the planned schedule.
Adinata,Surya dan Akbar Alfa 2020. ”Penerapan Metoda Konsep Nilai Hasil (Earned Value Concept) Pada Proyek Peningkatan Jalan Aspal Di Lokasi F4 (Sungai Sirih)”.Selodang Mayang :Jurnal Ilmiah Badan Perencanaan Pembangunan Daerah Kabupaten Indragiri Hilir 6(2) : 109.doi : 10.47521 / selodangmayang.v6i2.171.
Castollani, A., Puro, S., Maiko, *, & Dewa, L. (2020). Analisis Biaya dan Waktu pada Proyek Apartemen Dengan Metode Earned Value Concept. 3(1).
Devaux, S. A. (2014). Managing Projects as Investments Earned Value to Business Value.
Hanie Teki Tjendani, Nuri Maulidi, Miftahul Huda (2021). Analisis Biaya dan Waktu Pada Pembangunan Gedung Trauma Center Dan Intensive Care Tahap VI RSUD Dr.Soedono Madiun Dengan Metode Earned Value
Iman Soeharto. (1999).Manajemen-proyek dari konseptual sampai operasional: Vol. Edisi Kedua.
Izeul,Muhammad,Retno Indryani,Jurusan Teknik Sipil,FakultasTeknik Sipil,Institute Teknologi Sepuluh November,Jl.Arief Rahman Hakim,E-mail Retnoiceitsacid,and A.Kinerja Proyek.2015.”Metode Earned Value untuk Analisa Kinerja Biaya Pembangunan Condotel De Vasa Surabaya”.Jurnal Teknik ITS 4(1).
Mandiyo Priyo, T. Z., & Teknika, S. (2017).Penerapan Metode “Earn Value” Dan “Project Crashing” Pada Proyek Konstruksi: Studi KasusPembangunan Gedung IGD RSUD Sunan Kalijaga, Demak (The Application Of Earn Value Methode And Project Crushing Of Project Crushing: Case Study Construction Building Of Igd Rsud Sunan Kalijaga, Demak) (Vol. 20, Issue 1).
Muniroh, rifatul, & Buyang, C. (2021). Pengendalian Biaya Dan Waktu Dengan Earned Value Concept Pada Proyek Penataan Bangunan. Jurnal Simetrik, 11(1).
Nugroho,Wisnu Abiarto.2019.”Analisis Pengaruh keterlambatan Terhadap Biaya Menggunakan Earned Value Concept (Pada Proyek Jetty di Pulau Waibalun,Flores Timur)”.3:25-40.
Rifqi Auzan N, D. R. S. S. F. K. (2017). Pengendalian Biaya Dan Waktu Proyek Dengan Metode Konsep Nilai Hasil (Earned Value) (Vol. 6). http://ejournal-s1.undip.ac.id/index.php/jkts
Romadhonnia, N., Ferdaus, M., Aulady, N., & Nuciferani, F. T. (2018). Pengukuran Kinerja Waktu Dan Biaya Proyek Pembangunan Jetty Menggunakan Metode Earned Value.
Wahyuni, Elvi, and Bambang Hendrawan. 2018.“Analisis Kinerja Proyek ‘Y’ Menggunakan Metode Earned Value Management (Studi Kasus Di PT Asian Sealand Engineering).” Journal of Applied Business Administration 2(1):60–78. doi: 10.30871/jaba.v2i1.784.
Zakariyya,Bagus,Ahmad Ridwan,and Suwarno Suwarno.2020.
”Analisa Biaya dan Jadwal Proyek Pembangunan Gedung Dinas Kesehatan Kabupaten Trenggalek dengan Metode Earned Value.”Jurnal Manajemen Teknologi & Teknik Sipil 3(2) : 362.doi : 10.30737/jurnateks.v3i2.1197.